BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 29, 2025 at 8:00 PM

Updated April 30, 2025

Demolition, site work, paving, outdoor lighting and new construction of a mixed-use development in Anchorage, Alaska. Conceptual plans call for site work for a road / highway; for paving for a road / highway; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.

As of April 29, 2025, this solicitation is under negotiation. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: RFP Number .25252014 Project Numbers-State/Federal..: CFHWY01214 / TBD Project Site (City, Village, etc.). Eagle River, AK Project Title & Contract Description .: Glenn Hwy & Artillery Rd Interchange Improvements Design & Surveying Services The Contractor shall provide professional services to complete a bid-ready set of plans, specifications, and estimate (PS&E). The project will reconstruct the Glenn Hwy and Artillery Rd interchange, including replacing the existing bridge No. 1328. Project roadways include Artillery Rd (Eagle View Dr to Eagle River Rd), Glenn Hwy on- and off-ramps, Old Glenn Hwy (Eagle River Rd to Monte Rd), VFW Rd (Missionary Baptist Church to Eagle River Rd), and Old Glenn Hwy (Artillery Rd to Fire House Ln). Additional improvements include paving, grading, drainage, lighting, roadside traffic hardware, retaining wall(s), guardrail, non-motorized improvements (curb ramps, sidewalks, shared-use pathways), channelization, highway on- and off-ramps, intersections (signalized and/or innovative), shared-use pathways, landscaping, utilities, signage, and striping. Initial anticipated services through local review (35%) level include: Civil Engineering, Environmental, Archeological Survey, Surveying and ROW Mapping; Hydrologic and Hydraulic Design; Traffic and Safety Analysis; Design Study Report; Public Involvement; Overhead/Subsurface Utility Engineering; and Utility Coordination and Agreements. Anticipated initial period for performance-Begin/End: April 2025 - June 2030 The method of Contractor Selection has not been Determined at this time. AK DOT - RFP Engineering - Glenn Hwy & Artillery Rd Interchange Improvements Design & Surveying Services

Conceptual

Roads / Highways

$1,000,000.00

Public - State/Provincial

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
2
Bidding Soon
153
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2026

Project location map

Glenn Hwy & Artillery Rd, Anchorage, AK


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.