BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 19, 2025 at 8:00 PM

Updated March 20, 2025

Site work and paving for a civil project in West Jordan, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Estimated Construction Cost is $150,000-$380,000. Project involves constructing a new concrete flume structure on Bell Canyon Creek upstream of Bell Canyon Reservoir designed for measuring flow in the creek. Project includes clearing a space to install the flume, forming the structure, and pouring concrete. Project site is accessed above Bell Canyon Reservoir via a dirt access road that connects to a residential street. Project also includes improvements to the access road including installation of road base, drainage canals, and buried pipes. Each bid shall be accompanied by a certified or cashier's check, money Each bid shall be accompanied by a certified or cashier's check or approved bid bond in the amount stated in the Notice Inviting Bids. Said check or bond shall be made payable to the Owner and shall be given as a guarantee that the bidder, if awarded the work, will enter into a contract within 10 calendar days after receipt of the contract from the Owner, and will furnish the necessary insurance certificates, Payment Bond, and Performance Bond; each of said bonds to be in the amount stated in the Notice Inviting Bids. In case the apparent low bidder refuses or fails to enter into such contract or fails to provide the required insurance and insurance certificates, the check or bid bond, as the case may be, shall be forfeited to the Owner. If the bidder elects to furnish a bid bond as his bid guarantee, he shall use the bid bond bound herein, or one conforming substantially to it in form. An Award of Contract, if it were awarded, will be made within 60 calendar days of the opening of bids. COMPLETION OF WORK: All work shall be completed before February 13, 2026 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$341,650.00

Public - County

Paving, Site Work

15

12

4

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
56
Bidding Soon
1,025
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

April 17, 2025

Project location map

Multiple Locations, West Jordan, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.