EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 7, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a transportation facility in Rockford, Illinois. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Reference Number 0000376278 Job Location 60 Airport Drive Rockford, Illinois United States 61109 Participation Requirements - Minority Business Participation General Requirements - Bid Deposit Required - FOB Destination - Insurance Required - Local Service Required - Onsite Maintenance Required - Prevailing Wage Required - Warranty Information Required Scope of Work Partial depth pavement repairs as marked on map, estimated 2,602 square feet Asphalt removal and replacement with full depth concrete as marked on map, estimated 5,823 sf Priority 1 trench drain as marked on map, estimated 392 sf Priority 2 trench drain as marked on map, estimated 226 sf Priority 3 trench drain as marked on map, estimated 226 sf Priority 4 trench drain as marked on map, estimated 178 sf Mill and overlay 8 inch asphalt, 6" binder, 3" surface, assumes 18" thickness of existing material, estimated 28,800 sf Six percent contingency dollars for additional repairs encountered 2,388 sf of partial depth repairs are in B Ramp 264 sf of partial depth repairs are in C Ramp No partial depth repairs are in D Ramp Timeliness is of the utmost importance on this project. We will be shutting down the operation of our tenant during this repair time. As a result, provide the amount of time it will take you to complete the project. The amount of time to complete the project will be a consideration in selecting the successful bidder. You may access the work site 24 hours per day, 7 days per week, at your cost. GRAA will not pay for overtime required if the successful bidder falls behind and needs to work outside normal business hours to complete this project. See the next paragraph for penalties for late completion of this work. Due to the nature of this project, our client's business activity will be forced to stop until completion of the repairs on their ramp. Therefore, a penalty of $2,000 per day will be imposed for each day after the negotiated completion date with extensions due to delays for weather and other factors beyond the successful bidder's control. Question Deadline 02/18/2025 at 12:00 PM CT

Award

Transportation Terminals

$1,481,991.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
292
Active Projects
176
Bidding Soon
2,555
All Active Projects
1,259
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2025

April 28, 2025

img_map_placeholder

60 Airport Dr, Rockford, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Ramp Pavement Repairs at Chicago Rockford International Airport

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.