Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 25, 2025 at 7:00 PM
Updated October 1, 2024
Renovation of an educational facility in Charleston, South Carolina. Completed plans call for the renovation of a educational facility.
Vendor shall provide all necessary labor, equipment and materials to remove and replace existing cold room refrigeration equipment. All work shall be performed during normal work hours. Work shall include as follows: 1. To Remove The Existing Evaporator And Water Cooled Condenser From Atop And Inside The Cold Room Rm. 421 2. To Install New Refrigeration Equipment That Is Capable Of Maintaining 4C +/- 1C. Install New Line set To The New Evaporator And Condenser 3. To Connect Drain On New Evaporator To Existing Drain Line 4. To Connect All Associated Electrical To New Evaporator And Condenser 5. To Pressure Test The Refrigerant Circuits, Pull A Vacuum, And Charge Units To Specification And Check For Proper Operations 6. Owner Shall Do Any Ceiling Removal Required Location: MUSC Thurmond/Gazes Research Bldg. Rm 421 Address: 114 Doughty Charleston, SC 29425 Point of Contact: Daniel White, 843-792-2815, whitda@musc.edu The Vendor shall clean the Project site and work areas daily, including common areas and dispose of materials lawfully. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris. Do not hold waste materials more than seven days during normal weather or three days if the temperature is expected to rise above 80 deg F Handle hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally, according to regulations. Use containers intended for holding waste materials of type to be stored. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work. 1. Remove liquid spills promptly. 2. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as appropriate. Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.
Post-Bid
Educational
$200,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 21, 2025
March 24, 2025

114 Doughty St, Charleston, SC
Related To This Project
Charleston, SC
Bid Date: Feb 21 2025
Charleston, SC
Bid Date: Apr 17 2025
Charleston, SC
Bid Date: Apr 02 2025
Charleston, SC
--
Charleston, SC
Bid Date: Mar 10 2025
Charleston, SC
Bid Date: Feb 21 2025
Charleston, SC
Bid Date: Mar 12 2025
Charleston, SC
Bid Date: Mar 07 2025
Charleston, SC
--
Charleston, SC
Bid Date: Feb 22 2025
Charleston, SC
Bid Date: Mar 11 2025
Charleston, SC
--
Charleston, SC
Bid Date: Feb 19 2025
Charleston, SC
Bid Date: Feb 18 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.