BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 13, 2025 at 8:00 PM

Updated March 14, 2025

Site work and paving for a mixed-use development in Central Point, Oregon. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

SCOPE OF PROJECT: The work under this project includes all materials, labor, and equipment for a paving overlay of the Emigrant Lake Tent Campground The Jackson County personnel identified below is the only point of contact at Jackson County for inquiries related to this ITB unless modified by Addendum. Andrew Austill 7520 Table Rock Rd., Central Point, OR 97502 austilar@jacksoncountyor.gov 541-774-6231 Last Day to Submit Request for Change/Clarification March 7, 2025 The scope of the Project includes, but may not be limited to, the following: 1. Pavement overlay will consist of four (4) main camp loop roads, 40 campsite parking pads, two (2) ADA campsites and one (2) restroom parking areas. 2. Approximately 1,000 tons of asphalt will be needed for the 2" overlay using Level 1, 1/2 inch ACP with PG64- 22 Binder. 3. Campground will be closed from May 1 - May 15, 2025, to complete this work. The area will be completely closed off for the entire duration of the project

Award

Playgrounds / Parks / Athletic Fields

$145,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
15
Bidding Soon
140
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2025

May 5, 2025

Project location map

To Be Determined, Central Point, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.