BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2025 at 8:00 PM

Updated March 26, 2025

Site work and paving for a civil project in McKeesport, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

For the Milling and Resurfacing, Base Repair, Concrete Patching, Drainage, Guide Rail, Pavement Markings, and Other Miscellaneous Construction All Within a Length of 61,530 Linear Feet (11.65 Miles) as Indicated on the Approved Drawings Included in the Bid Package for Allegheny Group 111-25-7135-3 in Allegheny County, City of Mckeesport, Elizabeth and North Versailes Townships, and White Oak, Lincoln, Versailes and East Pittsburgh Boroughs, Commonwealth of Pennsylvania. This Project Being Situated as Follows: Sr 0048, Section A45 (Long Run Road) - From Sr 0148 (Walnut Street) at Segment 0170/0171 Offset 0000/0000 (Station 536+21) to Sr 2031 (Lincoln Way) at Segment 0220/0221 Offset 0056/0056 (Station 657+58). Sr 0048, Section A46 (Boston Hollow Road & Scenery Drive) - From Cowan Drive (Township Road) at Segment 0060 Offset 2584 (Station 266+10) to Sr 0148 (Walnut Street) at Segment 0170 Offset 0000 (Station 536+21). Sr 2037, Section A19 (Mckeesport Boulevard) - South From Sr 2112 (Electric Avenue) at Segment 0101 Offset 1381 (Station 156+50) to Sr 2068 (Navy Marine Corp Way) at Segment 0051 Offset 1816 (Station 166+16) and North From Sr 2068 (Navy Marine Corp Way) at Segment 0050 Offset 1746 (Station 166+16) to Sr 2112 (Electric Avenue) at Segment 0100 Offset 1320 (Station 157+00). Sr 2068, Section A03 (Navy Marine Corp Way) - From Sr 2037 (Mckeesport Boulevard) at Segment 0010/0011 Offset 0000/0000 (Station 0+00) to Sr 0030 (Lincoln Highway) at Segment 0010/0011 Offset 1385/1385 (Station 13+85). Sr 2083, Section A02 (Braddock Avenue) - From a Point 125 Feet North of Sr 2183 (Cable Avenue) at Segment 0032/0033 Offset 0050/0051 (Station 96+83) to the End of Sr 2083 (Braddock Avenue) at Segment 0012 Offset 0000 (Station 110+79). Project Cost Range: $10,000,000.00 - $12,499,999.99 Federal Project Status: PENNDOT Oversight NHS DBE: 10% Structure Work: 1.00% Pre-bid Meeting: None Anticipated Ntp: 04/28/2025 Wage Rates: Yes Required Completion: 12/23/2026 Prequalification Requirement: Yes State Type of Work: Resurfacing/overlays Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PA DOT - SR 48 Mill and Overlay *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$8,519,589.00

Public - State/Provincial

Paving, Site Work

184

10

24

7

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
101
Bidding Soon
1,605
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2025

April 28, 2025

Project location map

Multiple Locations, McKeesport, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.