Published April 22, 2025 at 8:00 PM

Updated April 23, 2025

Site work and renovation of a water / sewer project in Granbury, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Wastewater Treatment Facility Estimate: $6,000,000 Work of this proposed Contract comprises of installation of a packaged wastewater treatment plant provided under a separate contract as described in Section 33 32 00 Package Plant Equipment Installation as well as providing and installing structures, equipment, buildings, appurtenances, etc. as required by the plans for a full working wastewater treatment plant. General construction work is included. The deadline to ask questions is 3/07/2025 2:00 PM CST Submit all questions regarding clarification or interpretation of Bidding Documents to the office of the Engineer, Pape-Dawson Consulting Engineers, LLC, 6105 Tennyson Parkway, Suite 210, Plano, Texas 75024, Attn: Ted Nelson, CCM, CFM Phone (214) 420-8494 (ext. 673) or Fax (214) 420-8498, or email TNelson@PapeDawson.com. Construction a) Coordination with other contractors is necessary (Utility, Paving, Franchise, Retaining Wall, and Landscape). b) Contractor shall access the site through an existing gravel driveway on Old Granbury Road. The Contractor shall coordinate access with the Developer and District Engineer prior to construction. Any damage caused by the Contractor shall be repaired at the Contractor's expense. c) Erosion Control: The Erosion Control Plan, NOI, SWPPP and inspections are the responsibility of the Owner. Contractor will be responsible for maintenance of erosion control. d) Construction Staking: Refer to Supplementary Conditions. Contractor is responsible for costs associated with all re-stakes and all additional stakes above and beyond those mentioned in this section. Re-staking and re-verification costs will be tracked and handled on a case by case basis. e) Coordination with Testing Lab: Refer to Special Conditions. Contractor is responsible for scheduling, coordinating, and plotting all tests. Contractor is also responsible for ensuring that all tests and retests have passed. f) Safety rules and regulations are the Contractor's obligation to be observed for traffic and OSHA requirements on all construction phases of this project. The Contractor shall be responsible to ensure that any and all provisions of the various regulations are met and complied to. g) Water for construction purposes shall be supplied by the Owner from on-site water well and/or surface water detention ponds within Phase 1 of the development. Water well is located approximately 2,600 LF from WWTP site. Exhibit provided. h) Call Texas 811 to locate all existing utilities before any construction. i) A final geotechnical report prepared by Terracon is included for reference. j) Coordinate with Developer prior to any grading activities on adjacent properties.

Award

Water / Sewer

$5,200,000.00

Public - City

Renovation, Site Work

66

34

6

Subscribe For Documents

90 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
350
Active Projects
181
Bidding Soon
3,569
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2025

May 12, 2025

Project location map

East US Hwy 377 & Old Granbury Rd, Granbury, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.