BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 19, 2025 at 7:00 PM

Updated March 4, 2025

Site work and new construction of a mixed-use development in Ephraim, Wisconsin. Completed plans call for the construction of a municipal facility; for site work for a municipal facility; 5,000-square-foot pre-engineered storage facility; and pre-engineered storage facility.

Project Scope: In general, the project consists of a new Ground up Public Works Building of approximate first floor area of 5,000 sq. ft. including a Pre-Engineered Metal framed building for the Village of Ephraim Public Works Department. Schedule: Project is anticipated to start in May of 2025 and be substantially complete by September 2025. Prevailing Wages: Not Required. Bid Bond: A 10% Bid Bond or certified check is required with the bid payable to the Village of Ephraim. Performance Bond: 100 % Required Payment Bond: 100 % Required Qualification Statement: Bidders shall submit the Contractor Proof of Responsibility form provided in the Specifications a Minimum of (5) days prior to bid date. Failure to submit this information with Bid may result in rejection of the bid as non-responsive. The low responsive bidder will be recommended for contract award. The owner reserves theright to reject any bid, to waive irregularities in the bid or to accept a bid which will be the best interest of the Owner. Bids shall remain open to acceptance for a period of (60) days after bid due date. ** doc info : The Plans and Specifications will be available from the printer for a Refundable deposit if returned to the printer in good condition within seven days of bid opening.

Post-Bid

Municipal

$1,500,000.00

Public - City

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
60
Bidding Soon
446
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

May 1, 2025

Project location map

To Be Determined, Ephraim, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.