BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 21, 2025 at 7:00 PM

Updated March 18, 2025

Demolition, site work and renovation of a mixed-use development in Athens, Georgia. Completed plans call for the demolition of a educational facility; for the renovation of a educational facility; for site work for a educational facility; and sidewalk / parking lot.

The Board of Regents of the University System of Georgia (BOR) as Owner, on behalf of the University of Georgia (UGA), User is soliciting Statements of Qualifications from firms interested in providing construction management at-risk services for the construction of a project known as Project No. Solicitation No. 197509516 " BR-10-2504, OUA-25-037 Ramsey Student Center Strength and Conditioning lll" at the University of Georgia, Athens, Georgia. A project description is provided below: The Strength and Conditioning III project will include the conversion and renovation of two squash courts and six racquetball courts into an approximately 10,000 square foot strength and conditioning facility. This new S&C III area is anticipated to provide space for approximately 122 students, including infrastructure to support around 80 cardio machines, weight racks and free weight equipment, and general-purpose mats for stretching and other exercises. The project will provide ADA access to the renovated area and will replace the air handling unit which currently serves the racquetball and squash courts and other adjacent areas. The air handling unit is original to the building, beyond its expected life and does not have capacity to serve the new S&C III. The new unit will be larger to meet the needs of all areas served and will have the added benefit of addressing deferred capital renewal of this system. The University of Georgia will select several qualified firms from the response submittals, conduct a mandatory pre-proposal site visit with the finalists, conduct interviews, rank the finalists, and begin contract discussions with the selected firm. The Board of Regents of the University System of Georgia on behalf of UGA, is soliciting Statements of Qualifications from firms interested in providing construction management at-risk services Number 51800-eRFP-000001335-2025 The preliminary Stated Cost Limitation (SCL) or construction cost of the Project is estimated at $4,775,000. The final SCL may be revised by the Owner due to final programmatic requirements, funding availability or other circumstances. The Design Professional's services are anticipated to commence February, 2025. Construction documents are anticipated for completion in October, 2025. Preconstruction services are expected to begin immediately upon execution of the contract with the CM/GC. The CM/GC shall obtain written authorization from the Owner prior to proceeding with any additional services. The start of construction is anticipated to begin in December, 2025. (All of the dates above are estimates and are contingent on the availability of funding). b. Deadline for written questions/requests for clarification (see section 6) 02/24/25 4:00PM Questions about any aspect of the RFQ, or the project, shall be submitted in writing (e-mail is preferable) to: Issuing Officer Ben Fender Procurement Specialist 424 E Broad St. Rm 301 Athens, Georgia 30602 email: Benjamin.fender@uga.edu

Post-Bid

Educational

$4,775,000.00

Public - State/Provincial

Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
319
Active Projects
195
Bidding Soon
2,232
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2025

December 17, 2025

Project location map

To Be Determined, Athens, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.