BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 23, 2025 at 8:00 PM

Updated April 24, 2025

Renovation of a mixed-use development in Stratford, Connecticut. Completed plans call for the renovation of a educational facility.

Overhead Paging System Upgrades - Stratford Public Schools Direct all requests in writing to: Town of Stratford, Purchasing Department Attention: Phillip Ryan, Purchasing Agent E-mail: PRyan@townofstratford.com The Town of Stratford on behalf of its Board of Education (BOE) is seeking bids from qualified contractors to perform upgrades to overhead paging systems (OHP) located in six (6) elementary schools. ** Bid date info : Bidders are to complete all requested data in the upper right corner of this page and must return this page with their bid proposal No bid shall be accepted from, or contracts awarded to, any person/company who is in arrears to the Town of Stratford upon debt, or contract or who has been within the prior five (5) years, a defaulter as surety or otherwise upon obligations to the Town of Stratford. SCOPE OF WORK Overhead Paging (OHP) Head-End System Upgrade and Integration This project involves the decommissioning and removal of existing OHP Head-End equipment, installation of new digital and network-managed Head-End components, and integration with the existing CT-TSG Hosted Services VoIP phone system. The work includes testing and repurposing existing speaker infrastructure, installing new speaker trunk cabling, and ensuring seamless migration to the upgraded system. Equipment Requested: • ALGO Paging Adapter & Bell Scheduler - ALGO 8301 • LEA 4-Channel 70-volt Amplifier Tasks and Deliverables: 1. Decommission and Removal: • Remove all existing OHP Head-End components. • Ensure proper disposal or return of decommissioned equipment. 2. Installation of New Head-End Equipment: • Install new Head-End components in available rack space within the closest MDF or IDF closet. • Configure and secure equipment in compliance with best industry practices. 3. Speaker Cable Infrastructure: • Install a speaker cable splice cabinet in an optimal location for proper cable termination. • Run new speaker trunk cabling from the MDF or IDF closet to the newly installed splice cabinet. • Terminate existing speaker cabling in new combination blocks and dress professionally in the splice cabinet. Question Deadline 03/10/2025 at 12:00 PM ET

Award

Educational

$57,875.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
836
Active Projects
384
Bidding Soon
6,815
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

April 21, 2025

Project location map

Multiple Locations, Stratford, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.