Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 10, 2025 at 8:00 PM
Updated April 11, 2025
Site work and paving for a mixed-use development in Arlington Heights, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
As of April 1, 2025, this project has not yet been awarded. The award has not gone to board yet, but will be on 4/7. The 2025 RESURFACING PROGRAM & SIDEWALK PROGRAM project is to be constructed in 2025. This project shall include the resurfacing of approximately 5.18 miles of bituminous streets within the Village of Arlington Heights and the resurfacing of three Municipal parking lot. This work will include but is not limited to, bituminous surface removal; curb and gutter removal and replacement; sidewalk removal and replacement; bituminous paving; bituminous pavement patching; driveway repair; structure reconstruction; structure adjust-ments and restoration. The locations for this work are shown in the Contract Documents. This work shall be to the requirements as indicated in the Contract Speci-fications. In addition, the CDBG-funded work must comply with the following federal laws and regulations: All work must meet CDBG/HUD requirements. For all desig-nated work on the CDBG locations, bidders shall comply with Executive Order 11246 of September 24, 1965, entitled "Equal Employment Opportunity," as amended by Executive Order 11375 of October 13, 1967, and as supplemented in Department of Labor regula-tions (41 CFR chapter 60); the Copeland "Anti-Kick-back" Act (18 U.S.C. 874) as supplemented in Depart-ment of Labor regulations (29 CFR part 3); the Davis-Bacon Act (40 U.S.C. 276a to 276a-7) as supplemented by Department of Labor regulations (29CFRpart 5); Sections 103 and 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327330) as supplemented by Depart-ment of Labor regulations (29 CFR part 5); with all applicable standards, orders, or requirements issued under section 306 of the Clean Air Act (42 U.S.C. 1857(h)), section 508 of the Clean Water Act (33 U.S.C. 1368), Executive Order 11738, and Environmental Protection Agency regulations (40 CFR part 15); and mandatory standards and policies relating to energy efficiency which are contained in the Illinois energy conservation plan issued in compliance with the Energy Policy and Conservation Act (Pub. L. 94-163, 89 Stat. 871). [53 FR 8068, 8087, Mar. 11, 1988, as amended at 60 FR 19639, 19642, Apr. 19, 1995]; Housing and Community Development Act of 1974, as amended and 24 CFT Part 570; 2 CFR Part 200; Section 3 of the Housing and Urban Development Act of 1968, as amended (12 U.S.C. 1701u), and regulations at 24 CFR Part 135; 24 CFR Part 87 New Restrictions on Lobby-ing; and 24 CFR 570.611 (b) Conflict of Interest. The Affidavit of Availability must be submitted with the proposal, showing all uncompleted contracts awarded to them and all low bids pending award for Federal, State, County, Municipal and private work. All proposals or bids offered must be accompanied by a bid security in the amount of 10% of the total bid in the form of a certified check, bid bond or cashier's check made payable to the Village of Arlington Heights. No bids shall be considered unless accompa-nied by such security. Bidders shall comply with the Prevailing Wage Rate Act (820 ILCS 130) for the Base Bid, and the CDBG-funded work with the Department of Labor the Davis-Bacon Act wage rate will apply, the IDOT Standard Specifications for Road and Bridge Construction, adopted January 1, 2022, and the IDOT Supplemental Specifications and Recurring Special Provisions, adopted January 1, 2025. Bidders will also be required to comply with the applicable equal employment opportunity provisions. The Village of Arlington Heights reserves the right to reject any or all proposals, to waive informalities in bidding and to accept the proposal deemed by the Board of Trustees to be the most favorable to the interests of the Village. Bidder's questions will be responded to at that time only. It is suggested, but not required, that any questions regarding the bid documents be submitted to Tommy Sakkos, P.E., prior to the Pre-Bid Conference in order to allow the Village sufficient time to adequately research and prepare a response for the conference. ENGINEER: Tommy Sakkos, P.E. tsakkos@vah.com (847) 368-5254
Award
Roads / Highways
$3,298,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 04 - Masonry
Division 10 - Specialties
Division 11 - Equipment
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 26 - Electrical
Division 27 - Communications
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 12, 2025
April 11, 2025
Multiple Locations, Arlington Heights, IL
Related To This Project
Arlington Heights, IL
Bid Date: Mar 03 2025
Arlington Heights, IL
Bid Date: Apr 01 2025
Arlington Heights, IL
Bid Date: Mar 19 2025
Arlington Heights, IL
Bid Date: Mar 05 2025
Arlington Heights, IL
Bid Date: Mar 13 2025
Arlington Heights, IL
Bid Date: Mar 19 2025
Arlington Heights, IL
--
Arlington Heights, IL
--
Arlington Heights, IL
Bid Date: Apr 16 2019
Arlington Heights, IL
Bid Date: Mar 03 2025
Arlington Heights, IL
Bid Date: Feb 19 2021
Arlington Heights, IL
Bid Date: Jun 03 2020
Arlington Heights, IL
Bid Date: Feb 10 2025
Arlington Heights, IL
Bid Date: Jan 31 2025
Arlington Heights, IL
Bid Date: Feb 13 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find. Bid. Win. Your Next Project Starts Here.
ConstructConnect gives you the tools to search, analyze, and bid on verified commercial projects before your competition. Explore detailed project data, bidding timelines, and contact info—right when you need it.
Sign up now to get free company and project data instantly. No payment required.
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.