BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2025 at 8:00 PM

Updated March 29, 2025

Site work for a mixed-use development in Medford, Wisconsin. Completed plans call for site work for a road / highway; and sidewalk / parking lot.

of street painting: 1. Yellow Curb Painting: Approximately 14,500 L.F. (Main St east) Includes removing all loose existing paint, debris, dirt and grass before paint application. 2. White Stop Blocks: Approximately 3,300 L.F. Stop Blocks are 15 feet long by 1 foot wide. 3. Turning Lane Arrows: Approximately 1 4. Lane Marking: Approximately 1,000 L.F. 5. White Cross Walks: Approximately 7,000 L.F. (For new added crosswalks-the width between the two 4-inch lines will be five feet or width of the sidewalk) 6. White Parking Stalls: Approximately 10,000 L.F. White & Yellow Latex Paint Shall Conform to the Present State of Wisconsin Standard Specification Section 646. Starting date shall be May 1, 2025 with completion date being June 1, 2025. Work completed after June 1st shall carry a $100.00 per day penalty. Credit will be allowed on a day-to-day basis for rain delays. The City reserves the right to reject all bids.

Award

Roads / Highways

$13,090.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
51
Bidding Soon
367
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2025

May 1, 2025

Project location map

S Main St, Medford, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.