Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 28, 2025 at 8:00 PM
Updated March 29, 2025
Site work and paving for a road / highway in Shreveport, Louisiana. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Question Acceptance Deadline 03/18/2025 3:00 PM CT SCOPE OF WORK 5.1 The West Canal Blvd. Roadway Improvements Project is a part of the 2024 General Obligation Bond (G.O.B.) (Proposition No. 1). 5.2 The limits for this project are from Hollywood Avenue to Marquette Avenue. 5.3 The City and it’s G.O.B. Program Managing Consultants will negotiate and develop task orders for which services are to be rendered for this project. 5.4 The services expected to be included under this contract are those needed for complete project design and delivery services which may include but are not limited to: 5.4.1 Pre-Design 5.4.2 Condition Assessment 5.4.3 Topo & Boundary Survey 5.4.4 Utility Coordination 5.4.5 Geotechnical Evaluations 5.4.6 Permitting 5.4.7 Plat Preparation for Property Acquisition 5.4.8 Preliminary and Final Design 5.4.9 Bidding Phase Support Services 5.4.10 Construction Phase Services 5.4.11 RPR/Inspection services are not anticipated for City-funded projects but may be a requested service to be negotiated, if needed. 5.5 Typical roadway projects include but are not limited to the following types of improvements: 5.5.1 Roadway Alignment 5.5.2 Flexible Pavement 5.5.3 Rigid Pavement 5.5.4 ADA improvements and pedestrian facilities 5.5.5 Traffic Safety 5.5.6 Drainage 5.5.7 Street Lighting 5.6 The PEC shall use best practices and engineering judgement to develop the best approach and method for this project. 5.7 The City will provide available traffic data, archived record drawings, and any other pertinent documentation. 5.8 Total Design Budget: $500,000.00 6.0 REQUIRED PREREQUISITE EXPERIENCE 6.1 The PEC (Prime/subs) shall have significant and recent experience in providing the services laid out above. 6.2 New or innovative technologies that will make the project more efficient and cost effective will be considered. In the Transmittal Letter include the names of all subs and an estimate of the Fair Share/DBE goal to be achieved
Post-Bid
Roads / Highways
$500,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 25, 2025
July 25, 2025
W Canal Blvd, Shreveport, LA
Related To This Project
Shreveport, LA
Bid Date: Mar 11 2025
Shreveport, LA
Bid Date: Apr 03 2025
Shreveport, LA
--
Shreveport, LA
Bid Date: Mar 20 2025
Shreveport, LA
--
Shreveport, LA
--
Shreveport, LA
Bid Date: Aug 12 2025
Shreveport, LA
Bid Date: Mar 27 2025
Shreveport, LA
Bid Date: Mar 04 2025
Shreveport, LA
Bid Date: Mar 03 2025
Shreveport, LA
Bid Date: Mar 18 2025
Shreveport, LA
Bid Date: Mar 18 2025
Shreveport, LA
Bid Date: Mar 11 2025
Shreveport, LA
Bid Date: Feb 25 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
