BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 24, 2025 at 8:00 PM

Updated April 25, 2025

Renovation of a mixed-use development in Carter Township, Indiana. Completed plans call for the renovation of a educational facility.

https://mahometdaily.com/lincoln-trail-elementary-set-for-playground-upgrade/ Federal State of Illinois Local Editorial Local Lincoln Trail Elementary Set for Playground Upgrade March 27, 2025 8:50 pm by Dani TietzViews: 73 The Mahomet-Seymour Board of Education has approved a significant upgrade to the playground facilities at Lincoln Trail Elementary School. The decision, made during the March 24 meeting, aims to address the lack of adequate play equipment and improve accessibility for students requiring ADA accommodations. Funding and Costs The total cost of the playground improvements and installation is estimated at $114,715.05. Funding for this project will come from multiple sources: PTO Dawg Walk Donations: $67,194.85 from the Lincoln Trail activity account. Additional PTO Contribution: $20,000. Foundation Donation: Up to $15,000. Private Donation: $25,000. Any remaining funds after the installation will be allocated toward potential turf enhancements if approved. Vendor and Equipment Details The improvements will be carried out by Gametime through Cunningham Recreation, utilizing cooperative pricing. Gametime was previously involved in the first phase of the Middletown Prairie playground project and was selected as the sole bidder for that phase. The new playground equipment includes modular play units designed for children aged 5-12, featuring slides, climbers, transfer platforms, and ADA-accessible components such as hand cyclers and bongos. Addressing Accessibility The upgrade is particularly focused on improving accessibility for students with disabilities. Currently, Lincoln Trail Elementary has no equipment that accommodates ADA needs. The new installations aim to create an inclusive play environment for all students. _________________________________ North Spencer Chrisney, Lincoln Trail,& Nancy Hanks Elementary Playground Improvements The successful bidder shall, upon acceptance of its bid, be required to procure and pay for a Contractor's Bond for Construction (Form 86A or AIA Form A312) in an amount equal to its contract price. Such bonds shall comply with all laws of the State of Indiana governing public contracts let by local governmental units. Bidsshould be enclosed in a sealed envelope, addressed to the School Corporation, with the name and place of business of the bidder and the project name to which the bid relates on the envelope, all as more particularly set forth in the Instructions to Bidders. Bids should be made on the form included in the Project Manual which is based on the IndianaStateBoardofAccountsForm96(Revised2013), andshallbe accompanied by an acceptable certified check, cashier's check, or bid bond, executed by the bidder and an acceptable surety company, payable to the order of the School Corporation, in an amount not less than five percent (5%) of the total bid. In the event any bidder withdrawsits bid orfailsto execute a satisfactory contract or contracts and furnish a satisfactory performance bond or bonds within ten (10) days after a contract or contracts has been awarded to such bidder by the School Corporation, the School Corporation may declare its certified check or cashier's check or bid bond forfeited to the School Corporation as liquidated damages. The School Corporation shall have the right: to accept any Bidwithin sixty (60) days afterthe time of opening of the Bids, during which time no Bids shall be withdrawn; at any time to reject any and all Bids; and to waive all formalities or irregularities in the bidding. ** doc info : Digital files will be made available for purchase for the non-refundable amount listed on the e-planroom. If paying by check, please make checks payable to Repro Graphix, Inc. The depositwill be refunded in full to the bidderwhen the physical copies of the Plans and Specifications have been returned to Repro Graphix within ten (10) days afterthe time set for receiving bids, in good re-usable condition. Complete and detailed Drawings and Specificationsforthis work, including but not limited to the InstructionstoBidders,GeneralConditions, andGeneralRequirements are on file and may be examined at the following places: Repro Graphix, Repro Graphix, 14 N.W. 6th Street, Evansville, Indiana 47708, (812) 422-2400 By appointment only: North Spencer County School Corporation 3720 East State Road 162 Lincoln City, IN 47552 All questions shall be submitted via email only NO LATER THAN the end day 4:00 pm, February 26, 2025. Brad Eckerle beckerle@psci.net cc:angela@stengroup.com

Bid Results

Educational

$333,476.00

Public - County

Renovation

24

10

10

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
0
Bidding Soon
488
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2025

May 30, 2025

Project location map

Multiple Locations, Carter Township, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.