BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 7, 2025 at 8:00 PM

Updated June 21, 2025

Site work, paving and renovation of a mixed-use development in Milton, Florida. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and for the renovation of a service station / car wash facility.

Counties: Escambia Road Name: SR 8 (I-10) Limits: at Pensacola Weigh Station Project(s): 44199425214(*) Federal Aid No: N/A Total Roadway Length: 1.223 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 1.223 Miles Contract Days: 570 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Days Please read the full advertisement Description: The improvements under this contract consist of architectural renovations of the administrative buildings, comfort stations, and inspection barns to include electrical, HVAC, mechanical, concrete sidewalk replacement and other ancillary work at the westbound and eastbound weigh stations located near Pensacola on SR 8 (I-10) in Escambia County, Florida. A Builders License or General Contractors License is required for this project. For buildings three (3) stories or less in height, a Builders License or General Contractors License is acceptable. Buildings more than 3 stories in height require a General Contractors License. This building is less than 3 stories in height. Question Deadline 03/19/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 028 - Weigh Station - SR 8 (I-10)

Award

Service Station / Car Wash

$3,694,730.00

Public - State/Provincial

Paving, Renovation, Site Work

75

4

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
45
Bidding Soon
764
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2025

April 2, 2025

Project location map

FL-8, Milton, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.