Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 24, 2025 at 8:00 PM
Updated June 21, 2025
Site work and paving for a civil project in Milton, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; and water / sewer project.
Counties: Escambia Road Name: SR 8 (I-10) Limits: From E of Sr 95 (Us 29) to E of Sr 291 Project(s): 22245725201(*) Federal Aid No: D324022B Total Roadway Length: 1.859 Miles Total Bridge Length: 0.028 Miles Total Proposal Length: 1.887 Miles Contract Days: 200 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Days Please read the full advertisement Description: The Improvements under this Contract consist of, but are not limited to, MOT (standard, PCMS, barricade), protections (floating turbidity barrier, staked turbidity barrier), asphalt (milling, and resurfacing including bridge approaches for Bridge No. 480203 - SR 8 over SR 291 (Davis Highway), Bridge No. 480204 - Ramp G1 over SR 291, and Bridge No. 480205 - Ramp B1 over SR 291), friction course, drainage (inlets, manholes, culvert), guardrails, pavement markings (painted, thermoplastic, permanent tape, RPM), and sod along State Road 8 (I-10) from East of SR 95 (US 29) to East of SR 291 for 1.887 miles in Escambia County. Question Deadline 04/23/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 011 - Resurfacing - SR 8 (I-10)
Award
Roads / Highways
$7,444,117.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2025
June 30, 2025
FL-8, Milton, FL
Related To This Project
Milton, FL
Bid Date: May 08 2025
Milton, FL
Bid Date: May 08 2025
Milton, FL
Bid Date: Apr 28 2025
Milton, FL
Bid Date: May 12 2025
Milton, FL
--
Milton, FL
Bid Date: Mar 18 2025
Milton, FL
Bid Date: Apr 10 2025
Milton, FL
Bid Date: Apr 10 2025
Milton, FL
Bid Date: Mar 26 2025
Milton, FL
Bid Date: Mar 21 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
