Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 4, 2025 at 7:00 PM
Updated October 1, 2024
Renovation of a mixed-use development in Corry, Pennsylvania. Completed plans call for the renovation of a 218,600-square-foot, two-story above grade educational facility.
This specification includes all labor, supervision, equipment, tools, material, transportation and all means of construction necessary to complete all work shown on the drawings and specified in this division and as shown on the drawings and/or as described in this specification, or as is necessary to complete the project in a first-class manner. Provide also all equipment, shoring, pumping, barricades, night lights and all else necessary or required by the Architect and OSHA. Under this heading is all demolition necessary or shown on the drawings and/or specified herein. Also under this division is the restoration of the site for any damage to it as a result of this contract. Interior Work 1. Remove all surface materials and equipment on walls which will interfere with new work. 2. Removal of cabinetry, walls, sinks, flooring, markerboards, tackboards and ceilings. 5. Remove existing equipment and relocate only the items as indicated on the Drawings. 7. All demolition listed in the legend on the drawings and any other demolition, which might be required to perform all renovations and to construct all additions for the project are hereby included by the proper competent trades. Science Lab renovations to the Corry Area School District Middle and High School. New interior finishes, new walls and Mechanical. Electrical and Plumbing items. For each of the following: General, HVAC, and Electrical Construction for the Science Lab Renovation Work at Corry Area Middle and High School located at 540 East Pleasant Street, Corry PA 16407 Bid security in the minimum amount of ten percent (10%) of the bid shall be submitted with each bid. The successful bidder will be required to furnish Performance, Payment, and Maintenance Bonds. The Owner reserves the right to reject any or all bids and to waive any informalities in the bidding.
Post-Bid
Educational
$1,000,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 33 - Utilities
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 18, 2025
June 9, 2025
Multiple Locations, Corry, PA
Related To This Project
Corry, PA
Bid Date: Jan 06 2025
Corry, PA
--
Corry, PA
Bid Date: May 17 2024
Corry, PA
Bid Date: May 20 2024
Corry, PA
Bid Date: May 01 2024
Corry, PA
Bid Date: Oct 30 2020
Corry, PA
Bid Date: Nov 17 2023
Corry, PA
Bid Date: Aug 17 2020
Corry, PA
Bid Date: Jan 06 2020
Corry, PA
Bid Date: Jan 06 2020
Corry, PA
Bid Date: Jan 06 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Science Lab Renovation For the Corry Area Middle and High School
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.