BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 29, 2025 at 8:00 PM

Updated March 30, 2025

Site work and paving for a mixed-use development in Dacono, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000371394 Job Location: Dacono, CO Bid Intent Not Available Grandview Boulevard Improvements Project: The City of Dacono is soliciting bids for the Grandview Boulevard Improvements Project, encompassing a total project length of approximately 6,000 feet. The project aims to enhance infrastructure, improve stormwater management, and ensure safer and more accessible pedestrian pathways. Key elements of the project include: Removal and Replacement of Roadway Materials: Removal of existing aggregate and asphalt materials. Paving the roadway with new asphalt. Curb, Gutter, and Sidewalk Installation: Construction of new curb and gutter along the roadway. Installation of sidewalks along a portion of the project corridor to improve pedestrian accessibility. Stormwater Improvements: Installation of stormwater piping and related infrastructure to manage runoff and enhance drainage. Installation of over 200 LF of precast box culvert. Quantities for asphalt, sidewalk, stormwater piping, and other materials will be provided in the final contract documents. Contractors should refer to the full bid package for detailed specifications and requirements. We invite qualified contractors to submit their bids for this essential improvement project. For the furnishing of all labor, materials, tools, appliances, transportation, and services necessary for: This project generally consists of: Removal of 9200 SY of existing gravel roadway. Installation of 2000 LF of RCP storm sewer and related appurtenances. Installation of 134 LF 4x8 reinforced concrete box culvert (Precast). Installation of 80 LF 3x5 reinforced concrete box culvert (Precast). Construction of 6000 LF of concrete curb and gutter and 5000 SY of concrete sidewalk. Construction of 5800 TON of asphalt roadway. Question Deadline 03/21/2025 at 5:00 PM MT Questions are submitted online Yes Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % The Bidder to whom a Contract is awarded will be required to furnish a Performance Bond guaranteeing faithful performance and a Labor and Material Payment Bond guaranteeing payment of all debts arising out of the Work. The City of Dacono reserves the right to reject any and all bids and the right to waive irregularities or informalities in bids received.

Bid Results

Roads / Highways

$2,993,953.00

Public - City

Paving, Site Work

69

9

4

8

Subscribe For Documents

133 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
83
Bidding Soon
1,296
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2025

April 25, 2025

Project location map

Grandview Blvd, Dacono, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.