Published February 14, 2025 at 7:00 PM
Updated February 15, 2025
Site work and paving for a mixed-use development in Dacono, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Reference Number 0000372304 This project generally consists of: o Removal of existing turn pocket concrete curb and gutter, interior concrete, and asphalt along proposed concrete curb and gutter. o Construction of proposed concrete curb and gutter, interior concrete and associated asphalt patchwork. o Updated pavement striping to reflect intersection modifications. o Traffic control along proposed construction corridor. Job Location: Dacono, CO Bid Intent: Not Available The City of Dacono invites qualified contractors to submit bids for the Glen Creighton Turn Pocket Expansion project located south of the intersection of Glen Creighton Drive and Highway 52. This project aims to improve traffic flow by extending the length of the turn pocket. Project Scope: The project includes the following tasks: Removal Work: Removal of existing concrete curb and gutter. Removal of asphalt paving as needed. Construction Work: Construction of a new, extended curb and gutter system. Installation of 6" reinforced concrete pavement in the expanded turn pocket area. Asphalt patching to tie into the existing roadway as needed. Roadway Striping and Markings: Application of roadway striping to match the extended turn pocket layout. Installation of thermoplastic directional arrows for proper lane guidance. Traffic Control: Implementation of a traffic control plan to ensure the safety of workers and the public during construction activities. Question Deadline 02/04/2025 at 2:00 PM MT Questions are submitted online No Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % The Bidder to whom a Contract is awarded will be required to furnish a Performance Bond guaranteeing faithful performance and a Labor and Material Payment Bond guaranteeing payment of all debts arising out of the Work. The City of Dacono reserves the right to reject any or all bids, waive any informalities or technicalities, and award contracts deemed to be in the best interest of the city.
Post-Bid
Roads / Highways
$300,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
11
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 13, 2025
March 17, 2025
State Hwy 52 & Glen Creighton Dr, Dacono, CO
Related To This Project
Dacono, CO
Bid Date: Mar 04 2025
Dacono, CO
Bid Date: Mar 25 2025
Dacono, CO
Bid Date: Mar 26 2025
Dacono, CO
Bid Date: May 01 2025
Dacono, CO
Bid Date: Jul 24 2025
Dacono, CO
Bid Date: Feb 13 2025
Dacono, CO
Bid Date: Jan 23 2025
Dacono, CO
Bid Date: Dec 03 2024
Dacono, CO
--
Dacono, CO
--
Dacono, CO
Bid Date: May 22 2024
Dacono, CO
--
Dacono, CO
Bid Date: Mar 14 2024
Dacono, CO
Bid Date: Feb 27 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.