Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 15, 2025 at 8:00 PM
Updated April 1, 2025
Site work and paving for a mixed-use development in Winnipeg, Manitoba. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Reference Number 0000288084 Questions are submitted online No D3. SCOPE OF WORK D3.1 The Work to be done under the Contract shall consist of: (a) Asphalt Pavement Reconstruction and Associated Works (i) Aikins Street from Sutherland Avenue to Jarvis Avenue (ii) Robinson Street from Sutherland Avenue to Jarvis Avenue (b) Concrete Pavement Rehabilitation and Associated Works (i) Battery Street from Aberdeen Avenue to Redwood Avenue (ii) Mountain Avenue from Fife Street to McPhillips Street (iii) Radford Street from College Avenue to Mountain Avenue (c) Construction of New 100mm Concrete Sidewalk and Associated Works (i) Sutherland Avenue from Aikins Street to Charles Street D3.2 The major components of the Work are as follows: (a) Asphalt Pavement Reconstruction and Associated Works (i) Removal of existing sidewalk; (ii) Planing of existing asphalt at intersections as required; (iii) Renewal of existing concrete sidewalk as required; (iv) Tree stump grinding; (v) Construction of 100mm concrete sidewalk; (vi) Installation of detectable warning surface tiles; (vii) Removal of existing pavement; (viii) Removal of existing curb; (ix) Abandon existing catch basins and drainage inlets; (x) Installation of catch basins and sewer service pipes; (xi) Installation of subdrains; (xii) Excavation; (xiii) Compaction of existing sub-grade; (xiv) Adjustment of existing pavement and boulevard structures; (xv) Placement of geotextile fabric and geogrid; (xvi) Placement of sub-base material (placed in two lifts); (xvii) Placement of base course material; (xviii) Construction of barrier curb and reversed gutter for asphalt pavement, utilizing slip-form paving equipment; (xix) Construction of modified barrier curb with reversed gutter for asphalt pavement; D3. SCOPE OF WORK D3.1 The Work to be done under the Contract shall consist of: (a) Asphalt Pavement Reconstruction and Associated Works (i) Aikins Street from Sutherland Avenue to Jarvis Avenue (ii) Robinson Street from Sutherland Avenue to Jarvis Avenue (b) Concrete Pavement Rehabilitation and Associated Works (i) Battery Street from Aberdeen Avenue to Redwood Avenue (ii) Mountain Avenue from Fife Street to McPhillips Street (iii) Radford Street from College Avenue to Mountain Avenue (c) Construction of New 100mm Concrete Sidewalk and Associated Works (i) Sutherland Avenue from Aikins Street to Charles Street D3.2 The major components of the Work are as follows: (a) Asphalt Pavement Reconstruction and Associated Works (i) Removal of existing sidewalk; (ii) Planing of existing asphalt at intersections as required; (iii) Renewal of existing concrete sidewalk as required; (iv) Tree stump grinding; (v) Construction of 100mm concrete sidewalk; (vi) Installation of detectable warning surface tiles; (vii) Removal of existing pavement; (viii) Removal of existing curb; (ix) Abandon existing catch basins and drainage inlets; (x) Installation of catch basins and sewer service pipes; (xi) Installation of subdrains; (xii) Excavation; (xiii) Compaction of existing sub-grade; (xiv) Adjustment of existing pavement and boulevard structures; (xv) Placement of geotextile fabric and geogrid; (xvi) Placement of sub-base material (placed in two lifts); (xvii) Placement of base course material; (xviii) Construction of barrier curb and reversed gutter for asphalt pavement, utilizing slip-form paving equipment; (xix) Construction of modified barrier curb with reversed gutter for asphalt pavement; (iv) Adjustment of existing boulevard structures; (v) Construction of 100mm concrete sidewalk; (vi) Installation of detectable warning surface tiles; (vii) Construction of curb ramps; (viii) Renewal of existing curb as required; and (ix) Boulevard restoration and sod. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Bid Results
Roads / Highways
$2,353,929.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 13, 2025
June 4, 2025
Multiple Locations, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Mar 21 2025
Winnipeg, MB
Bid Date: Mar 27 2025
Winnipeg, MB
Bid Date: Mar 19 2025
Winnipeg, MB
Bid Date: Mar 04 2025
Winnipeg, MB
Bid Date: Mar 04 2025
Winnipeg, MB
Bid Date: Mar 04 2025
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Mar 21 2025
Winnipeg, MB
Bid Date: Mar 13 2025
Winnipeg, MB
Bid Date: Mar 07 2025
Winnipeg, MB
Bid Date: Feb 25 2025
Winnipeg, MB
Bid Date: Mar 17 2025
Winnipeg, MB
Bid Date: Mar 05 2025
Winnipeg, MB
Bid Date: Feb 24 2025
Winnipeg, MB
Bid Date: Mar 06 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
