BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 21, 2025 at 8:00 PM

Updated March 22, 2025

Site work and paving for a sidewalk / parking lot in Hastings, Minnesota. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

2025 Mill & Overlay Program Est. Completion Date: June 25, 2025 No prebid meeting. Pavement Resurface and Rehabilitation The project consists of milling (2") and overlaying 2.9 miles of residential and collector streets with spot concrete curb replacement, spot replacement of rings and castings on manholes and catch basins, providing truncated domes on sidewalk pedestrian ramps, sidewalk replacement and pavement striping. Streets include: 4th S from Dakota Summit Dr to General Sieben Dr; 16th St to 23rd St from Pleasant Dr to Westview Dr; Featherstone Rd from west end to Pleasant Dr; High Point Ct from Northridge Ct through cul-de-sac; Northridge Ct from Northridge Dr through cul-de-sac. Bids are for furnishing all work and materials for milling (2") and overlaying 2.9 miles of residential and collector streets with spot concrete curb replacement, spot replacement of rings and castings on manholes and catch basins, providing truncated domes on sidewalk pedestrian ramps, sidewalk replacement and pavement striping. All work shall be completed in accordance with the plans and specifications on file. Major construction quantities include: o 53,000 SY of Mill Bit Pavement (2") o 19 Pedestrian Ramps (Truncated Domes) o 6,450 Ton of Bit Street Paving o 33 Adjust Rings & Castings o 3,000 LF of B618 Concrete Curb & Gutter o 4,350 LF Pavement Markings Site Address: City of Hastings Site Directions: Hwy 55 to General Sieben Dr to Featherstone Rd. No bid will be considered unless filed ONLINE with the bid bond, in the amount of five percent (5%) of the bid as a guarantee that the bidder will enter in to a contract to perform said work. These bid bonds of the three lowest bidders will be retained until a contract has been awarded and signed by all concerned, but no longer than 60 day The bids for the work to be done shall be submitted upon the basis of cash payment for the work. No bidder may withdraw this bid for a period of 60 days after the date shown for opening thereof. The City of Hastings reserves the right to reject any or all proposals, waive informalities therein. General The following Special Provisions may duplicate or modify other portions of the specifications. Where any article or clause is modified, or any paragraph or subparagraph is deleted by these Special Provisions, the unaltered provisions of that paragraph or subparagraph or clause shall remain in effect. These Special Provisions shall be considered as forming a part of the contract. It is pointed out that the requirements of the standard specifications pertain to all divisions of the work. In cases where the standard specifications are in conflict with either the General Conditions or the Special Provisions, the order by which these documents supersede shall be 1. Special Provisions; 2. General Conditions; 3. Plans; and 4. Standard Specifications. Question Deadline 03/14/2025

Bid Results

Sidewalks / Parking Lot

$1,022,425.00

Public - City

Paving, Site Work

34

18

2

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
143
Bidding Soon
1,594
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

May 5, 2025

Project location map

Multiple Locations, Hastings, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.