Site work and paving for a mixed-use development in Nags Head, North Carolina. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Barnhill Contracting - Rocky Mount (HQ) with the amount of $1,715,382.17 S. Memorial Ave: consists of paving of approximately 140,700 square feet of asphalt surface overlay including S. Memorial Ave. between intersection with Bittern Street and intersection of E. 8th St. Paving thickness will be 1.75", a minimum 4' wide asphalt edge milling for concrete driveway transitions and a minimum 12' wide asphalt milling for street intersection pavement transitions. E. Ario St: consists of paving of approximately 7,692 square feet of asphalt surface overlay along Atlas St. spanning from Wrightsville Ave to S. Memorial Ave. Paving thickness will be 1" thickness, and a minimum 12' wide asphalt milling for street intersection pavement transitions E. Albatross St.: consists of paving of approximately 23,365 square feet of asphalt surface overlay along E. Albatross St. spanning from S. Wrightsville Ave to S. Virginia Dare Trail and includes E. Albatross Beach Access. Paving thickness will be 1" from S. Wrightsville to S. Memorial Ave. for approximately 7,430 square feet. Paving thickness will be 1.75" from S. Memorial Ave. to S. Virginia Dare Trail for approximately 6,765 square feet, and 1" from S. Memorial Ave to end of beach access for approximately 9,170 square feet, and a minimum 12' wide asphalt milling for street intersection pavement transitions. The successful Bidder shall be required to furnish a Construction Payment and Construction Performance Bond for 100% of the contract amount as security for the faithful performance and the payment of all bills and obligations arising from the performance of the Contract. S. Memorial Ave. 6-inch water main consists of approximately 879 linear feet of water main construction along the west side of South Memorial Avenue from north of the intersection of S. Memorial Avenue and Ario Street and continuing to south of the intersection of South Memorial Ave. and Atlas St., Nags Head, North Carolina. Construction consists of installation of a 6-inch water main to be connected to existing water main near the intersection with S. Memorial Ave. and Atlas St. with all appurtenances including but not limited to: valves, fire hydrants, hydrant relocations, tapping sleeves, bends, tees, crosses, elbows, service connections, fittings, supports and restraints. Water main shall achieve separations and setbacks as required by local and state minimum design criteria and as indicated on the plans. Approximately 1,435 square feet of permanent pavement patch will accompany this work Ario St. 6-inch water main: consists of approximately 392 linear feet of water main construction along the north side of Ario Street beginning north of the intersection of S. Wrightsville Ave. and Ario St. and continuing to north of the intersection of Ario St. and S. Memorial Ave., Nags Head, North Carolina. Construction consists of installation of a 6-inch water main to be connected to the new water main along S. Memorial Ave. with all appurtenances including but not limited to: valves, fire hydrants, hydrant relocations, tapping sleeves, bends, tees, crosses, elbows, service connections, fittings, supports and restraints. Water main shall achieve separations and setbacks as required by local and state minimum design criteria and as indicated on the plans. Approximately 535 square feet of permanent pavement patch will accompany this work. Albatross St. 6-inch water main: consists of approximately 767 linear feet water main construction along the north side of Albatross St. beginning north of the intersection of Albatross St. and S. Wrightsville Ave. and continuing east to the north side of the intersection of Albatross St. and S. Virginia Dare Trail. Construction consists of installation of a 6-inch water main to be connected to existing water main near the intersection of Albatross St. and S. Virgina Dare Trail with all appurtenances including but not limited to: valves, fire hydrants, hydrant relocations, tapping sleeves, bends, tees, crosses, elbows, service connections, fittings, supports and restraints. Water main shall achieve separations and setbacks as required by local and state minimum design criteria and as indicated on the plans. Approximately 740 square feet of permanent pavement patch will accompany this work. The bidder to whom this project is awarded shall have until June 9, 2025, to Substantially Complete the Waterline and Drainage Improvements Portion of the Project. Additionally, the bidder to whom this project is awarded shall have until October 15, 2025, to Substantially Complete the Street Resurfacing portion of the project. Steet Resurfacing shall not commence prior to September 15, 2025. Other provisions as to time of Full Completion, project milestones, Liquidated Damages, etc. are set forth in the Contract Documents All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Award

Roads / Highways

$1,715,382.00

Public - City

Paving, Site Work

22

16

11

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
31
Bidding Soon
417
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

May 26, 2025

Project location map

Multiple Locations, Nags Head, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.