BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 30, 2025 at 8:00 PM

Updated May 31, 2025

Site work and paving for a mixed-use development in Hibbing, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of May 30, 2025, the project was awarded to KGM Contractors, with an awarded amount of $2,746,571.70. S.AP. 131-185-009 23 Rd Street Reconstruction Project 2232.504 Mill Bituminous Surface- 14,704 SY 2360.509 Type SP 9.5 Wear Course Mixture (2,B)- 2,350 Ton 2521.518 Concrete Walk- 22,075 SF 2531.503 Concrete Curb and Gutter Design B418/B618- 5,429 LF 2301.604 Concrete Pavement- 3,885 S.Y. 2504.603 8" Watermain (Trenchless) - 1,319 LF 2504.603 8" PVC Watermain - 663 LF 2545.501 Lighting System - 3 LS he Project is defined as: 2 Section 5. The Owner and/or Project Contractor have the absolute right to select any qualified bidder for the award of contracts on this Project without reference to the existence or nonexistence of any agreements between such bidder and any party to this Agreement; provided, however, only that such bidder is willing, ready and able to become a party to and comply with this Project Agreement, should it be designated the successful bidder. Section 3. Nothing contained herein shall be construed to prohibit, restrict or interfere with the performance of any other operation, work, or function which may occur at the Project site or be associated with the development ofthe Project. Section 4. This Agreement shall only be binding on the signatory parties hereto and shall not apply to their parents, affiliates or subsidiaries. MILL PAVEMENT, BITUMINOUS SURFACING, SIDEWALK AND CURB & GUTTER, CONCRETE PAVING, WATER UTILTIY REPLACEMENT, LIGHTING SYSTEM. Each bid shall be accompanied by a certified check, bidders bond, or a cash deposit in an amount equal to at least five percent (5%) of the amount of the bid, which shall be forfeited to the City in the event the successful bidder fails to enter into a contract. The City Council reserves the right to reject any and all bids and to waive irregularities and informalities therein and further reserves the right to award the contract to the best interest of the city. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 03/07/2025 Every request for such interpretation should be in writing addressed to Jesse M. Story P.E City Engineer 401 East 21st Street Hibbing, MN 55746 and to be given consideration must be received at least five (5) days prior to the date fixed for the opening of bids.. Completion- August 29th, 2025

Award

Roads / Highways

$2,746,572.00

Public - City

Paving, Site Work

73

28

4

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
4
Bidding Soon
223
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2025

May 12, 2025

Project location map

23rd St, Hibbing, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.