Site work and paving for a mixed-use development in Fridley, Minnesota. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of May 14, 2025, this project has been awarded to Peterson Companies, Inc. with the bid amount of $6,302,616.82.** DESCRIPTION OF WORK: The work includes the construction of approximately: 17,000 CU YDS COMMON EXCAVATION & EMBANKMENT 2,000 TN PARKING LOT PAVING 550 LIN FT SANTIARY SEWER 800 LIN FT WATER MAIN & WATER SERVICE 3,000 LIN FT STORM SEWER 8.0 AC EROSION CONTROL & TURF ESTABLISHMENT IRRIGATION SYSTEM 48,000 SQ FT BITUMINOUS TRAIL 65,000 SQ FT CONCRETE WALK & ADA IMPROVEMENTS BASEBALL FIELD AND AMENITIES PICKLE BALL COURT AND AMENITIES LANDSCAPING PLANTINGS together with numerous related items of work, all in accordance with Plans and Specifications. This project is subject to Responsible Contractor Certification. Question Deadline 03/11/2025 COMPLETION OF WORK: All work under the Contract must be substantially complete by 06/06/2026 and ready for final acceptance 08/29/2026. BID SECURITY: A Proposal Bond in the amount of not less than 5 percent of the total amount bid, drawn in favor of City of Fridley shall accompany each bid. No bid may be withdrawn for a period of sixty (60) days. OWNER'S RIGHTS RESERVED: The Owner reserves the right to reject any or all bids and to waive any irregularities and informalities therein and to award the Contract to other than the lowest bidder if, in their discretion, the interest of the Owner would be best served thereby.

Award

Sidewalks / Parking Lot

$6,302,617.00

Public - City

Paving, Site Work

34

25

141

6

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Art, Sculptures, Cast Sculpture, Furniture, Residential Furniture, Beds
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Watering, Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Rigid Paving, Concrete Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Retaining Walls, Irrigation, Planting, Planting Preparation, Turf and Grasses, Seeding, Plants
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
54
Bidding Soon
1,032
All Active Projects
368
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

April 17, 2025

img_map_placeholder

555 61st Ave NE, Fridley, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.