BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 22, 2025 at 8:00 PM

Updated April 23, 2025

Demolition, site work and addition to an educational facility in McDonough, Georgia. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

https://www.henryherald.com/news/henry-school-board-approves-ola-high-addition-bid/article_894e4102-9d46-4405-9fb3-f8c613a9a68c.html Henry School Board Approves Ola High Addition Bid MCDONOUGH — The Henry County Board of Education unanimously approved a $6.53 million bid for additions to Ola High School at its Monday regular meeting. The contract with MEJA Construction includes eight new classrooms and two science labs along with an associated workroom and restrooms. The project also includes upgraded plumbing, electrical, HVAC equipment and low voltage systems (fire alarm, intercom, surveillance and intrusion detection systems). The school board also approved the following capital items Monday: — CTAE (Career, Technical and Agricultural Education) textbooks and instructional resources for $795,089.50. — Replacement of furniture at Excel Academy for $700,716.45. — Furniture for the Ola Middle School addition for $244,521.21. — Computer adaptive solution for elementary schools for $622,104.00. A computer adaptive solution offers individualized learning by tailoring instruction to meet individual student needs, adjusting the difficulty of tasks in real- time. — Computer adaptive solution for middle schools for $286,012.50. — Headphones for Georgia Milestones assessments for $316,955.99. Beginning in the 2025-2026 school year, there will be an update to the required Georgia Milestones English Language Arts assessment that will require students to access audio during the assessment.Headsets bought for elementary school students will also have the dual capacity of being used for required literacy screening, in accordance with the Georgia Early Literacy Act and Dyslexia Law. ---------------------------------------------------------------------------------------------- Description The Work consists of an 18,237sf addition: (8) Classrooms and (2) Science Labs along with an associated workroom and restrooms. The new addition is load bearing cmu construction (with sprayed fire protection) and sprinklered with a brick veneer exterior. The roof system is a Thermoplastic Polyolefin roof membrane on tapered insulation on metal roof deck. Upgraded plumbing, electrical, HVAC equipment, and low voltage systems (fire alarm, intercom, surveillance, and intrusion detection systems) are included in the scope. Contract, if awarded, will be on a lump sum basis. No bid may be withdrawn for a period of 60 days after time has been called on date of opening. Bids must be accompanied by a Bid Bond in an amount not less than 5% of the Base Bid. Both a Performance and a Payment Bond will be required in an amount equal to 100% of the Contract Price. The Owner reserves the right to reject any or all bids and to waive technicalities

Award

Educational

$500,000.00

Public - County

Addition, Demolition, Site Work

87

28

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
297
Active Projects
183
Bidding Soon
2,358
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

April 28, 2025

Project location map

357 N Ola Rd, McDonough, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.