BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 13, 2026 at 8:00 PM

Updated March 14, 2026

Site work and new construction of an educational facility in Riverside, California. Conceptual plans call for the construction of a 134,000-square-foot educational facility; and for site work for a educational facility.

This project proposes to construct a new Advanced Technology (Applied Technology) Building at Riverside City College (RCC). The proposed Advanced Technology building will encompass 134,000 Gross Square Feet (GSF) and consists of 93,570 Assignable Square Feet (ASF). Functional space within the building will include 4,800 ASF of classroom, 73,010 ASF of laboratory, 4,340 ASF of office, and 11,420 ASF of other support space. The programs proposed to be housed in the new building are Auto Technology, Welding, and HVAC. The new facility will include modern technology and infrastructure compatible with specialized equipment needs for the career technical education (CTE) programs that the building houses. The building will accommodate the College's enrollment by increasing instructional capacity for dedicated instructional space, faculty office space, and all other types of space. Colocating these important CTE programs into a new facility will improve access, enhance learning environments, and support collaboration. The proposed Advanced Technology Building is to be located at the center of campus adjacent to the Planetarium and Parking Lot F. The new building site location will enhance the development of a CTE core on campus. The existing Dispatch/Security Building (#9), Ground Equipment Storage (#33), Grounds Diesel Equipment Storage (#235), Ground Storage Garage (#221), Cesar Chavez Building (#10), Old Financial Services/Data Processing (#11), Elevator Tower (#204), Technology Building B (#7), and TSS Portable (233) will be demolished to provide a building site location. The Automotive Technology (#30), Auto. Tech. Storage (#220), and Technology A (#6) buildings will be inactivated and demolished after occupancy of the new building. As of March 13, 2026, this project is included in the Riverside Community College's 2027-2031 Capital Improvement Program (CIP). Information regarding a design firm and the general contractor selection timeline has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2028. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Educational

$124,849,733.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
611
Active Projects
293
Bidding Soon
4,182
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2029

Project location map

4800 Magnolia Ave, Riverside, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.