BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 23, 2025 at 8:00 PM

Updated March 24, 2025

Site work and paving for a sidewalk / parking lot in Des Peres, Missouri. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Scope of Work consists of the removal and replacement of approximately 7,000 SF of concrete sidewalk slabs in Spring Valley subdivision, off of Ballas Road. The City has budgeted $100,000 for sidewalk replacement, and the scope may be reduced in order to stay within the budget if necessary. Slabs to be replaced will be marked prior to the start of work by City Staff, as will articulated control joints. Each bid shall be accompanied by a certified check or bank draft on a responsible solvent bank or a satisfactory bid bond executed by the bidder and Surety company and payable to the City of Des Peres, Missouri, in the amount of not less than ten percent (10%) of the base bid plus the greatest of the alternate bids The Contractor shall furnish a Performance Bond in an amount equal to one hundred percent (100%) of the Contract Sum as security for the faithful performance of this Contract and also a Labor and Material Payment Bond in an amount not less than one hundred percent (100%) of the Contract Sum in a penal sum not less than that prescribed by State or local law, as security for the payment of all persons performing labor on the project under this Contract and furnishing materials in connection with this Contract. The Surety shall be a company licensed to do business in the State of Missouri and shall be acceptable to the City. The Performance Bond and the Labor and Material Payment Bond may be in one or in separate instruments. Traffic control and other incidental items shall be included as shown in the specifications. It is anticipated that work will start in April/May 2025, as weather allows. Not less than the prevailing hourly rate of wages shall be paid to all workers performing under this Contract in this area according to the rates determined by the Department of Labor and Industrial Relations of the State of Missouri. A bid security in the amount of ten percent (10%) of the bid amount must accompany each bid in accordance with the Instructions to Bidders. The City reserves the right to accept or reject any bid and to waive any irregularities in the best interest of the City.

Bid Results

Sidewalks / Parking Lot

$78,960.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
92
Bidding Soon
1,237
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

April 21, 2025

Project location map

Multiple Locations, Des Peres, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.