EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 26, 2025 at 8:00 PM

Updated June 27, 2025

Site work, renovation and addition to a municipal facility in Alameda, Saskatchewan. Conceptual plans call for the addition of a 1,000-square-foot, one-story above grade municipal facility; for site work for a municipal facility; and for the renovation of a municipal facility.

The Rural Municipality of Moose Creek No. 33 currently has a 40' by 48' office building located in the Town of Alameda. The existing lot is 50' by 120'. We are looking to build an addition to the rear of the building to match the existing building construction and foundation system. The addition will be 40' by 25' and will be used as a council chambers/board room. It should have plumbing for a sink or small kitchen area. The current council chambers will need to be turned into two rooms. One will be an office the other a small lunch room. The addition should be on the same plumbing, heating and electrical systems as the main building. TIMELINE: Request for Proposals from engineering consultants was not awarded as submissions came in over budget. No further design or construction work is expected to ensue. Coverage of this report is discontinued.

Project Abandoned

Municipal

Public - City

Addition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
8
Bidding Soon
61
All Active Projects
27
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2025

img_map_placeholder

115 5 St, Alameda, SK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.