Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 4, 2025 at 8:00 PM
Updated April 5, 2025
This is a service / maintenance or supply contract in Hot Springs, South Dakota. Contact the soliciting agency for additional information.
Bid is cancelled This solicitation is being cancelled due to quotes received outside of budget Solicitation W9128F25Q0023 is available in the Attachments section below. A site visit will not be established. The sites are accessible for review without prior authorization. Solicitation W9128F25Q0023 is available in the Attachments section below. A site visit will not be established. The sites are accessible for review without prior authorization. The Contractor shall furnish all labor, tools, materials, equipment, supplies and supervision necessary to accomplish herbicide application to control vegetation in identified areas. Spraying will be controlled so that trees (outside the spraying area), shrubs, flower beds, water, food and etc. are not damaged or contaminated by either the actual spraying/application, drift or runoff and in such a manner that shadowing around objects will not occur. A bio-degradable marker dye is required with all sprayings/applications. The Contractor shall so control all their operations during the performance of the work so as to ensure that the completed work meets all of the requirements of the specifications. All contracted tasks must be completed during the scheduled application period unless otherwise specified herein or authorized in advance by the Contracting Officer, or his/her authorized representative. Period of Performance. The period of performance shall be for one (1) Base Offer and two (2) Option Years. The Period of Performance reads as follows: Base Year: 30 April 2025 through 15 September 2025 - Active period of performance: 30 April 2025 through 15 September 2025 - Inactive period of performance: 16 September 2025 through 29 April 2026 Option 1: 30 April 2026 through 15 September 2026 - Active period of performance: 30 April 2026 through 15 September 2026 - Inactive period of performance: 16 September 2026 through 29 April 2027 Option 2: 30 April 2027 through 15 September 2027 - Active period of performance: 30 April 2027 through 15 September 2027 - Inactive Period of Performance: 16 September 2027 through 29 April 2028 All questions pertaining to this combined synopsis and solicitation shall be in writing, directed to the attention of Casey Barber at casey.m.barber@usace.army.mil. All questions shall be submitted not later than 2:00pm Central Time on 6 March 2025 to ensure adequate time is allotted for form an appropriate response and if needed, amend the solicitation.
Final Planning
Military
Public - Federal
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 13, 2025
October 6, 2025
Multiple Locations, Hot Springs, SD
Related To This Project
Hot Springs, SD
Bid Date: Apr 18 2025
Hot Springs, SD
Bid Date: Mar 20 2025
Hot Springs, SD
Bid Date: Jun 06 2025
Hot Springs, SD
Bid Date: Mar 27 2025
Hot Springs, SD
Bid Date: Jul 30 2025
Hot Springs, SD
Bid Date: May 07 2025
Hot Springs, SD
Bid Date: May 15 2025
Hot Springs, SD
Bid Date: Aug 06 2025
Hot Springs, SD
Bid Date: Aug 15 2025
Hot Springs, SD
Bid Date: Aug 04 2021
Hot Springs, SD
Bid Date: Jan 16 2025
Hot Springs, SD
Bid Date: Dec 17 2024
Hot Springs, SD
Bid Date: Nov 26 2024
Hot Springs, SD
Bid Date: Sep 11 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
