Site work and renovation of a civil project in Capon Bridge, West Virginia. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The work for this project will include the rehabilitation of approximately eighty (80) manholes, lining of approximately 680 LF of existing sewer lines, removal and replacement of approximately 400 LF of existing sewer lines, installation of two (2) elevated emergency generators, the replacement of pumps at the three (3) grinder stations, and other miscellaneous improvements to the collection system. Manhole rehabilitations will include replacing existing frames and covers with watertight models and sealing the manholes with an application of spray on epoxy lining. The Work will be substantially completed within 540 calendar days after the date when the Contract Times commence to run, and completed and ready for final payment within 570 days after the date when the Contract Times commence to run. Liquidated damages shall be $1,000.00 per day. Parts of the Work must be substantially completed on or before the following Milestone(s): Milestone 1: All work associated with manhole rehabilitations, sewer line removal and replacements, sewer linings, and other associated collection system improvements shall be completed within 270 days. Milestone 2: Emergency generator supply and/or installation and startup shall be completed within 540 days. A bidder may not withdraw his bid for a period of ninety (90) days after the date set for the opening of bids. Bids shall be accompanied by a certified check or bid bond payable to Town of Capon Bridge in an amount equal to five percent (5%) of the base bid. DBE Requirements - Each Bidder must fully Comply with the Disadvantaged Business Enterprises, and Affirmative Action Requirements, as identified in the contract documents. pre-meeting :Microsoft Teams https://tinyurl.com/CaponBridgePhaseIIPreBid Meeting ID: 280 849 451 172 Passcode: F7CF3rw7 Dial in by phone +1 304-935-0841, 110100024# Phone conference ID: 110 100 024# Question Deadline 03/26/2025

Award

Water / Sewer

$951,737.00

Public - City

Renovation, Site Work

28

16

18

6

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Welded Wire Fabric Reinforcing, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Cementitious and Reactive Waterproofing, Crystalline Waterproofing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Wall and Door Protection, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
48
Bidding Soon
1,064
All Active Projects
405
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2025

May 9, 2025

img_map_placeholder

259 Whitacre Lane, Capon Bridge, WV

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.