BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 1, 2025 at 7:00 PM

Updated March 28, 2025

This is a service / maintenance or supply contract in Morrow, Georgia. Contact the soliciting agency for additional information.

The Clayton County Water Authority (CCWA) owns and operates three water treatment plants, three wastewater treatment plants, ground and elevated storage tanks, booster pump systems, engineered constructed wetlands, and almost 3,000 miles of water distribution and wastewater collection pipelines. This bid is intended to select an experienced, licensed contractor to provide comprehensive repair services for all pumps used in the water and wastewater treatment processes, as well as distribution systems. Deadline for Questions : March 13, 2025 at 3:00 p.m. Questions must be submitted online through the Bonfire Portal.

Post-Bid

Water / Sewer

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
29
Bidding Soon
1,542
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

April 28, 2025

Project location map

Multiple Locations, Morrow, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.