BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 1, 2025 at 7:00 PM

Updated March 2, 2025

This is a service / maintenance or supply contract in Santa Ana, California. Contact the soliciting agency for additional information.

Question Deadline 03/04/2025 at 2:00 PM PT Online Q&A Yes The proposed First Street Multimodal Boulevard Study will complete a feasibility study, finalize the environmental phase, and develop plans, specifications, and estimates (PS&E) to prepare OCTA, the City of Santa Ana, and Tustin for construction. The project will evaluate and simulate potential improvements to address the multimodal goals for the corridor. OC Bus route 64, which serves this segment of First Street, is heavily utilized by transit riders. The Santa Ana Transit Cooperative Study has outlined recommended transit improvements, and this project will assess their feasibility, along with other potential enhancements, including active transportation improvements. The Study serves as a valuable foundation for this effort. Upon completion of the simulation and evaluation of potential multimodal solutions, this project will produce a detailed PS&E package, which can be used to secure construction funding. This initiative aims to improve transit services for populations dependent on buses and similar modes of transportation. According to CalEnviroScreen 4.0, residents in the First Street area face some of the highest poverty levels in the city. Improved transit access will enhance mobility to key amenities such as education, job centers, and markets. Additionally, the project will improve efficiency for transit-dependent workers, including those with non-traditional work schedules or peak commuting hours. The proposed improvements will also benefit disadvantaged populations by reducing greenhouse gas emissions. This Scope of Work describes work elements necessary for the various tasks related to the First Street Multimodal Boulevard project. This project will be led by the City of Santa Ana through a cooperative agreement with OCTA. The major project components of this scope of work include the following elements to be completed: 1- Assessment of Existing Conditions 2- Outreach and Engagement 3- Conceptual Planning 4- Plan Production and Approval

Conceptual

Roads / Highways

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
660
Active Projects
297
Bidding Soon
3,640
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2025

Project location map

E 1st St, Santa Ana, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.