BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 19, 2025 at 8:00 PM

Updated March 20, 2025

Site work for a water / sewer project in Modesto, California. Completed plans call for site work for a water / sewer project.

Agency: Stanislaus Regional Housing Authority Bid Contact: Rafael Cercas (209) 557-2090 rcercas@stanregionalha.org 1612 Sisk Rd Modesto, CA 95350 Introduction: The Stanislaus Regional Housing Authority (Authority) is a public agency, formed under the United States Housing Act of 1937, charged with providing decent, safe and affordable housing for low-income persons. The United States Department of Housing and Urban Development ("HUD") provides the funding for this work and therefore all work performed must be in compliance with all rules and regulations of this program, and all other applicable Federal regulations including, but not limited to, Handicap Accessibility (Section 504), Americans with Disabilities Act (ADA), Uniform Federal Accessibility Standards (UFAS), Davis-Bacon wage requirements, Environmental Protection Agency rules and regulations, HUD's Modernization Design Standards and Federal procurement requirements. In addition to the Federal laws, rules and regulations, all work must also be performed in compliance with state, county and local laws and regulations. The Contractor shall obtain all required approvals and permitting through the local governing agency, fees shall be paid by the Authority. All local, state and federal codes and regulations shall be followed by the Contractor. Local Permit fees will be paid by the Authority. The Authority is soliciting bids from qualified Contractors (Contractor) to provide renovation work including but not limited to; all items included in the Sedgwick adjusters damage report for 201 E. Coolidge Ave #C2 & #C8 Modesto, CA 95350. PROJECT DESCRIPTION: Project is located in the City of Modesto Ca, 201 E. Coolidge Ave. #C2 & #C8 Proposals shall include a detailed schedule of values (at Davis Bacon Wage Rates) with an all-inclusive Base Price. Please also submit a schedule and timeline for completion. The Authority reserves the right to issue modifications to this IFB at any time, award the proposed project to more than one firm, reject all proposals, and ask for any clarifications or verifications from Proposers at any time. Questions must be submitted in writing to website. All bids must be submitted in Public Purchasing. Instructions can be found at website. Last Day for Questions: Wednesday, March 5, 2025 at 5:00 p.m. Any prospective bidder desiring an explanation or interpretation of the solicitation, specifications, drawings, etc., must request it at least 7 days before the scheduled time for bid opening. Requests may be oral or written SCOPE OF WORK: Contractor shall furnish all labor, materials, tools, equipment, transportation and supplies necessary to perform the fire damage repair specified in Exhibit I Scope of Work Sedgwick adjusters damage report for 201 E. Coolidge Ave, #C2 & #C8 Modesto, CA 95350. 1.0 The Authority is not responsible for actual dimension and quantities required to complete the work. 2.0 CONSTRUCTION SCHEDULE AND HOURS OF WORK 2.1 The exact starting and ending dates for this project have yet to be defined. The Authority estimates that this project will start in April 2025 and will be completed in 120 days. 2.2 Contractor shall be responsible for the disposal of the materials demolished at the site during this project, and such disposal shall be performed in compliance with all applicable laws. All work performed in removing the existing material and installing the new products must be performed by properly licensed personnel. 2.3 In performing all services, the Contractor shall comply with all applicable federal, state, county, and city statutes, ordinances, and regulations. If such compliance is impossible for reasons beyond its control, the Contractor shall immediately notify the Authority of that fact and the reasons therefore. All work shall be inspected and signed off by the Authority Authorized Representative before the work is deemed complete. No payment will be made until all work is completed to the satisfaction of the manager and is deemed complete. 3.0 PROPERTY DAMAGES 3.1 Contractor shall be responsible for repair of any damages to Authority property and restoration of any area disturbed by installation work to the satisfaction of the Authority Authorized Representative prior to final payment. 3.2 Any repair and/or restoration of damaged area shall be performed at no cost to the Authority. 4.0 SPECIAL PROVISIONS 4.1 Contractor shall supply all safety or warning signs, equipment, plastic covers, barricades and any other specialty items that may be required. 4.2 Contractor shall proceed with installation work to be performed in accordance with manufacturer's recommendations and warranty requirements.

Bid Results

Water / Sewer

$44,800.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
469
Active Projects
202
Bidding Soon
2,664
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

May 19, 2025

Project location map

201 E Coolidge Ave, Modesto, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.