Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 4, 2025 at 7:00 PM
Updated March 20, 2025
Renovation of a municipal facility in Downey, California. Completed plans call for the renovation of a municipal facility.
The elevators are located at Downey City Hall 11111 Brookshire Avenue, Downey CA, 90241. The elevators are about 40-years and have not undergone any major upgrades. Below is general elevator information: o Duplex o State # 75484 / 75483 o Speed 150 fpm o Capacity 2500 o Stops 3 General Scope of Work: Controller o Remove existing relay logic controller o Replace with a non-proprietary solid-state microprocessor controller o New energy efficient motor soft starter o New floor stopping and leveling equipment o Phase I and phase Il fire service o New hoistway wiring and traveling cable o Door lock monitoring protection o Low oil protection o Seismic features o Emergency Return Unit board to be included Features of the new controller to include stuck button protection, door motor protection and an on-board diagnostic station. Car operating panel (C.O.P.) and hall push buttons o Remove and replace the C.O.P. (car operating panel) with a new C.O.P. o New digital position indicator built into C.O.P. o New A.D.A. emergency phone built into C.O.P. o Integrated emergency light and alarm bell o Built in group IV fire service controls o New surface mounted hall push buttons installed at 42" above floor at each floor o D.A. passing gong and floor arrivals o No smoking sign o Certificate holder o Hoistway jamb braille o Hoistway access switches The new C.O.P. will integrate ADA compliant features including vandal resistant pushbuttons, raised 1/8" braille tags with contracting backgrounds and threaded studs, ADA approved speaker phone, Phase II Fireman's Service and Jewel, emergency light unit, digital position indicator, passing chime and engraved signage. Working phone line will be provided by others. Pump unit Replacement o New motor o New pump o New Maxton control valve or equal. o New oil reservoir o Install new oil o New Vick gaskets on oil line o Inline muffler o Safety valve in pit o Inline shutoff valve Remove existing oil and transfer to appropriate containers for proper disposal. Coordinate with City to dispose of waste oil. Vantage Cab and Hoistway Door Equipment o New MOVFR (or equal) door operator that drive open and close the doors o Set of 3 hall door tracks o 1 car door tracks o 1 door clutch mechanism o 3 hall door closers o 3 hall door interlocks o 1 car door gate locks and California compliant restrictors o Fire rated wire ran to all door lock devices o Total 8 door rollers for cab and hall doors Cab interior work o New mirrored stainless steel drop ceiling with 6 recessed can lights o Reskin the existing raised panels with a Formica color of your choice o Add new stainless steel kick plates to the bottom of each raised panel o Add new A.D.A. compliant handrail on back wall or cab o Standby for carpet installation It is the contractor's responsibility to become familiar with the operation and mechanical systems of the existing elevators at City Hall in order to complete the work. Type of Award Lump Sum. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 03/10/2025 at 5:00 PM PT Online Q&A : Yes. The contractor is to complete all work in 45 working days. The City's preference is to have non-proprietary controller equipment to allow flexibility of maintaining the elevators. During the work one elevator is to remain in service at all times to allow access to the upper floors while improvements are made to the second elevator. Contractor shall be licensed in the State of California C-11-Elevator Contractor. Contractor shall pull all required State, County and City Permits before start of work. Copies are to be provided to Public Works Project Engineer. Contractor shall have a current City of Downey Business License. A copy of the current business license shall be provided to the Public Works Project Engineer. All work shall be per latest versions of the Building Codes and Fire Codes. All work to meet latest version of the ANSI Safety Code for Elevators and Escalators and ADA requirements. The contractor shall work with the City to schedule State required inspections. Carpet will be removed and installed by others.
Post-Bid
Municipal
$1,000,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 19, 2025
April 21, 2025
11111 Brookshire Ave, Downey, CA
Related To This Project
Downey, CA
Bid Date: Apr 03 2025
Downey, CA
Bid Date: Apr 10 2025
Downey, CA
Bid Date: Jun 13 2019
Downey, CA
Bid Date: Apr 14 2025
Downey, CA
Bid Date: Apr 17 2025
Downey, CA
Bid Date: May 15 2025
Downey, CA
Bid Date: Mar 06 2025
Downey, CA
Bid Date: Mar 11 2025
RFP - Capital Improvement Project No. 23-03 Downey Bike Master Plan Implementation Phase 1 - 5686258
Downey, CA
Bid Date: Mar 11 2025
Downey, CA
Bid Date: Feb 12 2025
Downey, CA
Bid Date: Feb 04 2025
Downey, CA
Bid Date: Jan 14 2025
Downey, CA
Bid Date: Jan 06 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
