Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 26, 2025 at 8:00 PM
Updated May 27, 2025
Site work for a water / sewer project in Portland, Oregon. Completed plans call for site work for a water / sewer project.
Terminal 6 Free Bird Area Fence Installation Removing the existing fence and providing a new fence along the east end of the Terminal 6 property line from the Columbia River boundary to North Suttle Road. The work includes providing new galvanized 7-foot-high chain-mesh fence on sloped areas and galvanized 5-foot-high chain-mesh fence atop concrete ecology blocks on level ground; and removing trees along the fence line. Estimated Bid Value $450,000 Type of Award Lump Sum Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 04/02/2025 at 5:00 PM PT Online Q&A Yes The bidder promises that all work under this Contract shall be substantially complete within 40 days from the date specified in the written Notice to Proceed. The bidder agrees to pay, as liquidated damages to the Port for any delay, the sum of $500 per day for each day of delay beyond the substantial completion date so promised. The bidder further promises that all work under this Contract shall be complete, having gained a successful final inspection and received final acceptance from the Port, within 90 days after substantial completion. Final payment will not be made until the work is judged complete by the Port. This is a standard low-bid solicitation, and contract award will be based on the total bid amount, per the unit bid prices from the bidder. The Port intends to issue a limited NTP upon contract execution, which will allow the contractor to proceed with submittals and subsequent procurements. The Port intends to issue full NTP for work on site upon receiving the permits for the project, which is currently forecasted for early September. The contractor is tasked with supplying and providing all of the materials to construct the fencing including the eco blocks. The contractor is tasked with supplying and providing all of the materials to construct the fencing including the eco blocks. If you would like to propose another type of eco block you will be required to have Port approved pre bid new product. See the Substitution Request form in the instruction to bidders section for requesting this.
Award
Water / Sewer
$415,500.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2025
May 9, 2025
7201 N Marine Dr, Portland, OR
Related To This Project
Portland, OR
--
Portland, OR
Bid Date: Apr 22 2025
Portland, OR
--
Portland, OR
Bid Date: Mar 20 2025
Portland, OR
Bid Date: Apr 09 2025
Portland, OR
Bid Date: Mar 18 2025
Portland, OR
Bid Date: Apr 08 2025
Portland, OR
--
Portland, OR
--
Portland, OR
--
Portland, OR
Bid Date: Apr 18 2025
Portland, OR
Bid Date: Mar 13 2025
Portland, OR
Bid Date: Mar 18 2025
Portland, OR
Bid Date: Mar 28 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
