BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 31, 2025 at 8:00 PM

Updated April 1, 2025

Site work and paving for a mixed-use development in Dexter, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

https://thesuntimesnews.com/tag/public-safety-investment/ Dexter Unveils $32.6M Capital Plan, Prioritizing Public Safety and Infrastructure Dexter’s six-year Capital Improvement Plan outlines major investments in public safety, road maintenance, parks, and utilities, with a record $11 million earmarked for public safety facilities. Photo: Construction site for Dexter’s new Public Safety Facilities. Photo by Doug Marrin The City of Dexter’s newly approved Capital Improvements Plan (CIP) for fiscal years 2025-2030 includes 74 ----------------------------------------------------------------------------- Reference Number 0000378274 The approximate quantities of major items of work involved are as follows: Approximately 0.23 miles of resurfacing on Carrington Dr, Coventry Cir, S Downs Dr, and Preston Cir in Dexter, MI. The work shall also include curb and gutter, sidewalk, ADA ramp replacements, structure adjustments, and driveway approach replacements. The City is offering residents of the Dexter Crossing and Huron Farms subdivisions the opportunity to replace their driveway curb drops and upper driveway at the residents' expense. An estimated quantity of curb drops and driveway removal and replace is included in the bid form, however, the actual quantity and addresses is unknown and will be provided to the contractor after bid award. Question Acceptance Deadline 03/14/2025 05:00 PM EDT Questions are submitted online No Bid Security in the form of a Certified or Cashier's Check or Bid Bond for a sum no less than five percent (5%) of the amount of the Bid will be required with each Bid. No pre-bid meetings are scheduled for this project. No Bid may be withdrawn for a period of sixty (60) calendar days after the scheduled closing time for receipt of the Bids. *The OWNER reserves the right to accept any Bid, reject any Bid, or waive irregularities in Bids.

Bid Results

Roads / Highways

$746,458.00

Public - City

Paving, Site Work

24

7

5

Subscribe For Documents

78 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
376
Active Projects
205
Bidding Soon
2,580
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

June 16, 2025

Project location map

Multiple Locations, Dexter, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.