BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 21, 2025 at 8:00 PM

Updated April 22, 2025

Site work for a water / sewer project in Ayer, Massachusetts. Completed plans call for site work for a water / sewer project.

The Town of Ayer DPW is seeking bids for the "Cambridge Street Water & Drainage Improvements" project. The base bid consists of the installation of approximately 800 linear feet of 8-inch ductile iron (DI) water main on Cambridge Street. The work includes replacement of water main appurtenances, hydrant assemblies, house service connections, and interconnections with other streets within the limits of work. The base bid also includes replacement of drainage and sewer infrastructure. The additive alternate includes additional water main replacement work on Norwood Avenue (Cambridge Street to Central Avenue). The Notice to proceed to start construction will be issued no earlier than June 1st, 2025. The time for completion of this contract is 120 calendar days following the Notice to Proceed to start construction. The bidding and award of this Contract will be under the provisions of M.G.L. Chapter 30, Section 39M. Complete instructions for filing Bids are included in the Instructions to Bidders. Each General Bid shall be submitted in accordance with the Instructions to Bidders and shall be accompanied by a Bid Security in the amount of 5 percent of the Bid. No Bidder may withdraw his Bid for a period of sixty (60) days, excluding Saturdays, Sundays, and legal holidays after the actual date of the opening of the General Bids. This advertisement does not obligate the Owner for any costs associated with preparing or submitting bids. The successful General Bidder must furnish a 100 percent Performance Bond and a 100 percent Payment Bond with a surety company acceptable to the Owner. Minimum wage rates as determined by the Commissioner of the Department of Workforce Development under the provisions of M.G.L., Chapter 149, Section 26 to 27D, as amended, apply to this project. It is the responsibility of the contractor, before bid opening, to request, if necessary, any additional information on Prevailing Wage Rates for those trades people who may be employed for the proposed work under this contract. The Owner reserves the right to waive any informality in or to reject any or all Bids if deemed to be in its best interest.

Award

Water / Sewer

$367,400.00

Public - City

Site Work

14

11

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
610
Active Projects
225
Bidding Soon
4,632
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2025

June 1, 2025

Project location map

Cambridge St, Ayer, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.