BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 23, 2025 at 8:00 PM

Updated May 24, 2025

Demolition, site work, renovation and addition to a water / sewer project in Marble Falls, Texas. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

Marble Falls WWTP 3 MGD Expansion - GMP #1 Long Lead Equipment, Temporary Facilities, & Site Preparation Type: Water, wastewater, site preparation, temporary facilites, long lead equipment Owner: City of Marble Falls Location Burnet County, TX Map Code: Show Google Map Open Map On Google Scope The City of Marble Falls is requesting Bids for long lead equipment, temporary facilities, and site preparation for the 3 MGD Wastewater Treatment Plant Expansion. Contact Address City of Marble Falls 800 3rd Street Marble Falls, Texas 78654 Contact Info Contact: Jeff Prato Phone: 830-262-0232 Fax: Email: jprato@marblefallstx.gov Question Submission Deadline:March 21, 2025, 5:00pm Bypass needs will be addressed in a subsequent bid packet, GMP Packet No.1 focuses only on long lead equipment, to be installed within the project. Warranties are addressed in Section 01 78 36, a minimum of two (2 years) after the date of substantial completion. The CMAR will be managing the ordering and delivery of equipment, coordinating with the successful selected manufacturer to ensure equipment arrives on site, in a timely manner to ensure the progress of the project. Equipment shall be stored per the manufacturer's O&M instructions and installed accordingly. Equipment once installed should be ready for startup testing and running to prove compliance to meet substantial completion requirements. The engineer can only review approved equals if all requested documentation is submitted with a proposal. If the equipment meets the specific design needs of the project called for in the technical documents, it will be scored per the evaluation criteria. The City, CMAR and Engineer will provide a comprehensive, fair and impartial review based on information submitted. Bidresult 1D 26 00 00 T Morales $3,195,000.00 1E 33 21 00 Non-Potable Plant Water Skid System Premier Flow $167,693.00 3.1F 40 05 45 Gates, Slide, and Weir Rodney Hunt $159,000.00 1G 40 05 61 Gate Valves Ferguson $195,860.99 1H 40 05 62 Plug Valves Ferguson $610,474.55 1I 40 05 64.33 Industrial Butterfly Valves Ferguson $26,949.81 1J 40 05 65 Valves for Flow Control and Check Services Ferguson $256,605.42 1K 43 11 15 Blowers, Positive Displacement Aerzen $305,169.00 1L 43 11 19 Foul Air Fans Bioair $106,767.50 1M 43 23 15 Pumps, Rotary Lobe Pump (Sludge Pumps) McFarland $45,000.00 1O 43 23 51 Pumps, Vane Pumps (Grit Pumps) Trilium $71,410.00 IP 42 25 00 Pumps, Submersible – Immersible Zone Ind. $920,000.00 1Q 44 31 11 Biological Tower Type Odor Control System Bioair $279,686.24 1S 46 21 53 Influent Screen System, Perforated Plate Screens Huber $725,000.00 1T 46 23 23 Vortex Grit Removal Equipment and 46 23 63-PS Grit Classifying (Combined) Ovivo $532,385.00 . 1U 46 31 11 Gaseous Chlorine Feed System – Vacuum Type DeNora $73,150.00 1V 46 33 33 Polymer Blending and Feed Equipment BDP Ind. $65,500.00 1W 46 41 26 Compressed Gas Mixing System Enviromix $183,790.00 1X 46 51 21 Aeration System, Coarse Bubble Membrane Diffusers SSI $75,200.00 1Y 46 53 00 Aerobic Granular Sludge Treatment System Equipment Aqua Aerobics $5,480,620.00 1AA 46 61 41 Clot Media Effluent Filters - Disc Filters Aqua Aerobics $805,945.00 1AB 46 76 22 Belt Filter Press BDP $783,500.00 2A 01 50 00 Temporary Facilities and Controls Nelson Lewis $410,000.00 2B 31 00 00 Site Setup and Improvements Nelson Lewis $1,015,000.00

Bid Results

Water / Sewer

$16,489,707.00

Public - City

Addition, Demolition, Renovation, Site Work

328

37

43

9

Subscribe For Documents

68 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
86
Bidding Soon
1,844
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2025

May 8, 2025

Project location map

Multiple Locations, Marble Falls, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.