Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 19, 2025 at 8:00 PM
Updated December 10, 2025
Site work and paving for a mixed-use development in Waconia, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
https://www.hometownsource.com/sun_patriot/community/waconia-oks-contracts-for-downtown-project-phase-3/article_78970531-db22-41ba-807b-358a10696180.html The Waconia City Council at its March 24 meeting awarded construction contracts for the Phase 3 downtown construction project slated for 2025 with a goal to get that started as soon as possible, possibly by May 1. The construction contract went in the amount of nearly $3.5 million to low bidder GMH Asphalt Corporation which had earlier been the contractor for the phase one downtown project. The council also awarded a contract for streetlighting equipment in the amount of $265,000 to low bidder Border States. Lead time for manufacturing and shipment of that equipment is anticipated at 12 to 14 weeks. ___________________ DESCRIPTION OF WORK: The work includes the construction of approximately: 10,000 CU YD 3,500 CU YD 7,000 TON 3,500 TON 25,000 SQ FT 3,500 LIN FT 1,600 LIN FT 2,000 LIN FT 28 EACH 1,500 LIN FT 4,000 LIN FT OWNER'S RIGHTS RESERVED: The Owner reserves the right to reject any or all bids and to waive any irregularities and informalities therein and to award the Contract to other than the lowest bidder if, in their discretion, the interest of the Owner would be best served thereby. Common Excavation Select Granular Borrow Aggregate Base Class 5 Bituminous Paving Concrete Sidewalk Concrete Curb & Gutter Sanitary Sewer Watermain Water Services Storm Sewer 1" - 4" Irrigation Watermain together with numerous related items of work, all in accordance with Plans and Specifications. This project is subject to Responsible Contractor Certification. COMPLETION OF WORK: Substantial completion in the September 12, 2025. All work under the Contract must be complete by July 3, 2026. BID SECURITY: A Proposal Bond in the amount of not less than 5 percent of the total amount bid, drawn in favor of City of Waconia shall accompany each bid. OWNER'S RIGHTS RESERVED: The Owner reserves the right to reject any or all bids and to waive any irregularities and informalities therein and to award the Contract to other than the lowest bidder if, in their discretion, the interest of the Owner would be best served thereby.
Bid Results
Roads / Highways
$3,492,828.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 20, 2025
May 19, 2025
Multiple Locations, Waconia, MN
Related To This Project
Waconia, MN
Bid Date: Mar 14 2025
Waconia, MN
Bid Date: Apr 29 2025
Waconia, MN
Bid Date: Jul 15 2025
Waconia, MN
--
Waconia, MN
--
Waconia, MN
Bid Date: Sep 05 2025
Waconia, MN
Bid Date: Oct 31 2025
Waconia, MN
--
Waconia, MN
Bid Date: Feb 12 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
