Site work and new construction of a transportation facility in Kearny, New Jersey. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.

This Project will include the construction of a new substation on an elevated platform immediately west of the existing Substation 41 in Kearny, New Jersey (see attached illustrations below). The Kearny Substation 41 Reconstruction Project is a critical infrastructure improvement project on the Northeast Corridor ("NEC") that will enhance the reliability and resiliency of intercity and commuter rail services. . Scope of Work The Project scope includes, but is not limited to, the construction of a new substation platform that will be elevated on precast concrete girders to protect equipment against a 500-year flood event, raising of the existing access road, construction of a retaining wall, and installation of new transmission and signal power wires. The Project will also decommission and remove the old substation equipment. Due to the location of the project site, temporary access roads are anticipated throughout construction. The Project consists of, but is not limited to, the following construction elements: 1. Construction of an elevated access road including a load distribution platform and retaining wall; 2. Construction of a new elevated substation on precast concrete girders, a prefabricated control house, all traction power equipment, steel gantries and all bonding and grounding; 3. Substation rail return to Right of Way (ROW); 4. Commissioning of the substation equipment; and 5. Removal of existing transmission structures and existing substation equipment. Question Deadline 03/17/2025 at 5:00 PM ET Please note all communications, questions and LOI responses related to this solicitation should be directed only to the Contracting Official, Jerard Linnemann, at Jerard.Linnemann@amtrak.com. **Amtrak does not publicly make available bid tabulations or award information for any of their projects.**

Post-Bid

Transportation Terminals

$5,480,000.00

Public - Federal

New Construction, Site Work

32

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,010
Active Projects
531
Bidding Soon
7,832
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2025

December 1, 2025

Project location map

To Be Determined, Kearny, NJ


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.