BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2025 at 7:00 PM

Updated March 6, 2025

This is a service / maintenance or supply contract in Berkeley, California. Contact the soliciting agency for additional information.

Estimated Construction Cost: $150,000. Background The Hearst Mining Memorial Building is an approximately 141,000 square foot building that was built in 1907 and underwent major renovations in 2002, and the last full-building balance was performed in 2003. The building currently houses labs, classrooms, and collaborative spaces on multiple floors. In current conditions, the building performance does not meet safety requirements in normal nor alarm conditions. A CxA is required to assess and determine the path forward to correct the performance of the building's HVAC system. The proposal shall include all retro-commissioning and TAB services outlined in this RFQ. The successful firm will create specifications, review and comment on the product design document submittal and provide services through the Construction Documents, Construction, and Warranty phases, and enhanced commissioning services meeting LEED requirements. Question Deadline 03/06/2025 at 4:00 PM PT

Conceptual

Educational

$150,000.00

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
433
Active Projects
172
Bidding Soon
3,199
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2025

Project location map

To Be Determined, Berkeley, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.