Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 20, 2025 at 8:00 PM
Updated March 21, 2025
Site work for a civil project in Rockaway Beach, Oregon. Completed plans call for site work for a water / sewer project.
Primary Sludge & Trickling Filter Pump Replacement. The Work Under This Contract Will Include the Replacement of the City's Primary Sludge and Trickling Filter Recirculation Pumps at the City's Wastewater Treatment Plant. Valves Shall Be Ordered and Installed as Shown on the Plans and Electrical System Shall Be Replaced in Kind From the Service Disconnect Switch Through the Pump. Contractor Shall Coordinate Start Up and Provide O&m Manuals. All Equipment, Labor, and Electrical Work Shall Be Provided by the Contractor as Shown on the Plans. All Work Under This Contract Must Be Substantially Completed Within 30 Calendar Days of the Notice to Proceed. Bids Will Be Received as a Combination of Unit Price and Lump Sum Bid Items. No Bid Will Be Considered Unless Fully Completed in the Manner Provided in the Instructions to Bidders, and Accompanied by a Bid Security Executed in Favor of the Owner in the Amount Not Less Than 10% of the Total Amount of the Bid. Bid Security is to Be Forfeited as Fixed and Liquidated Damage Should the Bidder Neglect or Refuse to Enter Into a Contract and Provide Suitable Insurance Certificates, Bonds and Other Required Documents for the Faithful Performance of the Work in the Event the Bidder is Awarded the Contract. Doc Notes: Complete Digital Project Bidding Documents Are Also Available for a Non-refundable Payment of $25.00. Interested Parties May Download the Digital Bidding Documents at online. in the Upper Right-hand Corner of the Webpage. Please Contact Questcdn.com at 952-233-1632 or Info@questcdn.com for Assistance in Free Membership Registration, Downloading, and Working With This Digital Project Information. Est. Value Notes: $200,000-215,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Water / Sewer
$215,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 20, 2025
April 21, 2025
408 S 3rd Ave, Rockaway Beach, OR
Related To This Project
Rockaway Beach, OR
Bid Date: Aug 13 2025
Rockaway Beach, OR
Bid Date: Feb 19 2026
Rockaway Beach, OR
Bid Date: Oct 14 2024
Rockaway Beach, OR
Bid Date: Jul 24 2024
Rockaway Beach, OR
Bid Date: Mar 27 2024
Rockaway Beach, OR
Bid Date: Feb 10 2021
Rockaway Beach, OR
Bid Date: Jun 13 2022
Rockaway Beach, OR
Bid Date: Jan 28 2022
Rockaway Beach, OR
Bid Date: Sep 14 2023
Rockaway Beach, OR
Bid Date: Aug 18 2022
Rockaway Beach, OR
Bid Date: Jul 21 2022
Rockaway Beach, OR
Bid Date: Jan 04 2023
Ashland, OR
Bid Date: Apr 03 2025
Sherwood, OR
Bid Date: Mar 20 2025
Hillsboro, OR
Bid Date: Mar 26 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
