Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 7, 2025 at 7:00 PM
Updated March 8, 2025
This is a service / maintenance or supply contract in Paris, Kentucky. Contact the soliciting agency for additional information.
Power Plant Inspection Specifications inspection on your Fairbanks Morse Model 38D8-1/8: o Initial Inspection (walk around) including: o Notate any visual damage or defect to engine and generator o Check oil level in sump and governor o Check water level in cooling system expansion tank o Check for oil leakage o Check for air leakage o Inspect water pump packing for leakage o Inspect coupling to generator flange bolts and foundation bolts for missing or loose fasteners or locking devices o Inspect log history for trending irregularities o Remove access covers and complete inspection of the following components: o Control racks of injection pumps o Injection nozzle opening pressures o Remove and inspect vertical drive spring pack wear plates and springs o Check upper and lower vertical drive gears and backlash o Check vertical drive radial bearing clearances o Check and set crankshaft lead o Check fuel injection timing Page 2 of 3 o Check upper and lower crankshaft thrust clearance o Inspect torsional damper and crankcase condition o Check lower crankshaft web deflection o High-Definition, Color Video-Scoping of the following components: o Intake manifolds o Scavenging Air Blower Lobe condition o Cylinders o Pistons Crowns o Exhaust manifolds o Removal of Selected Components including: o Remove, inspect for metal particles, clean and replace oil strainer elements o Remove two lower pistons, inspect interior liner condition and check adapters for leaks o Inspect removed pistons for wear and ring groove dimensions o Inspect external liner condition for possible coolant leaks o Inspect liner bore condition and wear o Inspect wrist pins, rod, rings, and bushings from two removed pistons o Inspect blower lobe clearances and flexible drive o Inspection of fuel and cooling piping and associated equipment o Complete re-assembly, check fasteners and test run engine (provided conditions permit safe operation)
Post-Bid
Water / Sewer
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 7, 2025
April 7, 2025
Multiple Locations, Paris, KY
Related To This Project
Paris, KY
Bid Date: May 19 2025
Paris, KY
Bid Date: May 28 2025
Paris, KY
Bid Date: Jul 24 2025
Paris, KY
Bid Date: Jul 24 2025
Paris, KY
Bid Date: Aug 14 2025
Paris, KY
Bid Date: Aug 11 2025
Paris, KY
Bid Date: Sep 04 2025
Paris, KY
Bid Date: Mar 20 2025
Paris, KY
Bid Date: Jan 24 2025
Paris, KY
Bid Date: Jan 21 2025
Paris, KY
Bid Date: Dec 06 2024
Paris, KY
Bid Date: Oct 22 2024
Paris, KY
Bid Date: Jun 27 2024
Paris, KY
Bid Date: Jul 12 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
