EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 19, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Peoria, Illinois. Completed plans call for site work for a water / sewer project.

GPSD 2844: Automation Updates Phase 1: PLCs 1-5 Site Address: 2322 S. Darst Street City: Peoria County: Peoria State/Province: IL Est. Completion Date: June 1, 2026 Pre-Qualification: Yes Any person contemplating a bid may request an interpretation of the Specifications or other Construction Document. Any such request, including requests for substitution of specified item(s), shall be submitted in writing to the Engineer a minimum of five (5) business days prior to the start of the Bid Acceptance Period. Requests submitted within five (5) business days of the Bid Acceptance Period will not be reviewed, nor will a response be issued. Any interpretation of the proposed documents will be made only as an addendum duly issued. Furthermore, Addenda will not be issued after the Bid Acceptance Period has begun. A copy of such addendum will be electronically delivered to all prospective bidders. The project consists of the upgrade of five treatment plant PLC control panels, installation of associated radio network hardware, and replacement of four RAW/WAS variable frequency drives (VFDs). A site visit is required prior to bidding. Question Deadline 03/27/2025

Sub-Bidding

Water / Sewer

$300,000.00

Public - City

Site Work

182

9

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Control-Voltage Electrical Power Cables, Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Exterior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Trenching, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
51
Bidding Soon
609
All Active Projects
350
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

May 1, 2025

img_map_placeholder

2322 S Darst St, Peoria, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Automation Updates - Phase 1 Replacement of PLCS1-5

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.