BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 26, 2025 at 8:00 PM

Updated April 27, 2025

Site work for a mixed-use development in San Bernardino, California. Completed plans call for site work for a municipal facility; and water / sewer project.

The purpose of this project is to rapidly implement drainage preparations per the Vista Fire Burned Area Emergency Response [BAER] on the San Bernardino National Forest, Front Country Ranger District. This contract provides for the equipment, labor, and services necessary to perform work ordered by the Government for installing two hazard signs, one 6" gate, one 8" gate, placing 25 rock boulder barricades, and 1 mile of restore drainage function, in compliance with the terms, specifications, drawings and provisions of this contract. Locations of work will be directed by the Forest Service. The San Bernardino National Forest has hazard signs, posts, 6" closure gate (All parts), and an 8" closure gate locking post located at the San Bernardino National Forest Supervisor's Office. The project location is in multiple locations on the Front Country Ranger District The terrain can be relatively flat in a few areas and moderately hilly and steep in others. Soil conditions vary as well, from soft and sandy to compacted and extremely rocky. The address is 602 S. Tippecanoe Ave, San Bernardino, CA, 92408. The Government has estimated project magnitude and price range of between $25K and $100K. All Requests for Information (RFIs) shall be submitted to the Contract Specialist via email to Tanya.Torres@usda.gov, on the attached RFI form, no later than 18 March 2025, 1100 AM hours PST. There will be no Forest Service Led Site Visit. In no event shall failure to inspect the site constitute grounds for a claim after contract award. The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 calendar days. The time stated for completion shall include final cleanup of the premises. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$39,000.00

Public - Federal

Site Work

7

7

3

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
4
Bidding Soon
2,047
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2025

April 14, 2025

Project location map

Multiple Locations, San Bernardino, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.