Site work and paving for a mixed-use development in Dickinson, North Dakota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This Project will consist of the following approximate quantities and types of work (not all bid items are listed): Construction of approximately 2,250 LF of 6 to 8 watermain and associated valves, fittings and appurtenances; 40 water service lines ; 2,100 LF of 8 sanitary sewer CIPP lining; 1,280 LF of 15 to 36 RCP storm sewer ; 22 storm sewer inlets and manholes; 15,075 SY of bituminous and concrete removal; 5,250 LF of curb removal; 6,500 TON Aggregate Base Course CL 5; 2,800 TON Superpave FAA 45; 5,075 LF curb and gutter; 2,075 SY sidewalk concrete; 750 SY driveway concrete; street lighting; traffic control; erosion control; and incidental items. The goal for MBE is 2% of the total dollar value of the project. The goal for WBE is 3% of the total dollar value of the project. To demonstrate a good faith effort to comply, bidders must include the MBE/WBE subcontractor solicitation form in the bid package. The Work under this Contract shall achieve Substantial Completion by October 17, 2025, and Final Completion by October 31, 2025 . Question Deadline 03/20/2025 All questions regarding the contract documents shall be directed to the office of Apex Engineering Group, Inc., Jason Gullicks, PE at 701-323-3953 or by email at Jason.Gullicks@ApexEngGroup.com . All questions must be received in writing or by email on or before eight (8) days prior to the bid opening. Responses to technical questions will be issued by addendum within six (6) days prior to the bid opening. Each Bid shall be accompanied by a separate envelope con taining a Bidder's Bond in a sum equal to five percent (5%) of the full amount of the Bid, executed by the Bidder as prin cipal and by a surety company authorized to do business in this state, conditioned that if the principal's Bid is accepted and the contract awarded to the principal, the principal, within ten (10) days after Notice of Award, shall execute and effect a con tract in accordance with the terms of his Bid and a Contractor's Bond as required by law and the regulations and determinations of the governing body. The Bid Bond of the three lowest Bidders will be retained until the contract has been awarded and executed, but not longer than sixty (60) days. The Bid security is a guarantee that the Bidder will enter into contract for the work described in the Proposal. The bidder may submit a Bid Bond, certified check, or cashier s check payable to the City of Dickinson, North Dakota. The successful Bidder shall be required to furnish both a Performance Bond and Payment Bond in the full amount of the Contract.

Post-Bid

Roads / Highways

$2,000,000.00

Public - City

Paving, Site Work

141

13

5

6

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
12
Bidding Soon
93
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2025

May 27, 2025

Project location map

Multiple Locations, Dickinson, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.