BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2025 at 8:00 PM

Updated September 13, 2025

Site work and paving for a sidewalk / parking lot in Monticello, Arkansas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Full Phase 2 Project Focuses on the Construction of a Beginner/intermediate Level, Bike Optimized Trail Network Which Incorporates Some Elements of Flow as the Natural Terrain Allows. Trails and Trail Features Will Be Constructed to Meet or Exceed Imba Standards. The Trails Will Be Dual Direction & Multi-use Trails With Some Flow Features and Built to Be Bicycle Optimized. Phase 2 Shall Include 3 Project Areas. A. 7 Mile Southwest Connector Trail, B. 4 Mile Nw Loop, C. 3 Intermediate Decent Trails Totaling 4200lf. The Selected Consultant Will Not Necessarily Be Selected on Pricing Alone Rather Selected Contractor Will Be Deemed an Overall Fit in Terms of Construction Quality, Pricing, And Ability to Collaborate With the Project Team. If You Have Questions, Please Direct to Jeff Newton (Jnewton7@gmail.com or 870- 723-4259), Dr. Doug Osborne (Osborne@uamont.edu or 870-460- 1448), or Jason Akers (870-367-4400 Ext. 221). The City of Monticello Reserves the Right to Accept or Reject Any Or All Proposals for Any Reason. The City of Monticello, Arkansas is seeking proposals for the construction of Job #020744, Lake Monticello Trail Ph. 2 (Monticello) (RTP-1302(360), TAPSC-9293(13), which is estimated to The Full Phase 2project Focuses on the Construction of a Beginner/intermediatelevel, Bike Optimized Trail Network Which Incorporates Some Elements of Flow as the Natural Terrain Allows. Trails and Trailfeatures Will Be Constructed Tomeet or Exceed Imba Standards.the Trails Will Be Dual Direction & Multi-use Trails With Some Flowfeatures and Built to Be Bicycleoptimized. Phase 2 Shall Include 3project Areas. A. 7 Mile Southwest Connector Trail, B. 4 Mile Nw Loop,c. 3 Intermediate Decent Trails Totaling 4200lf. A. Singletrack Connectortrail - 7 Miles (Figure a) I. A Traditional Cross-countrystyle Trail That Connects Existingtrails to the Lake Levee Ii. Tread Experience Shall Besimilar in Both Directions of Travel.iii. Lift and Tilt Surface Will Beneeded. B. Northwest Loop - 4 Miles (Figure B) I. A Traditional Cross-countrystyle Trail That Would Be Suitablefor Hosting a National Interscholastic Cycling Associationrace. Ii. All Tread Shall Be Constructed With a Tread of Four (4) Feet Wideusing a Full Bench Excavationwhenever Possible, Iii. The Trail is Also Wide Enough To Allow for Opt-out Routes Around Any Technical Features and Highly Visible Sight Lines That Facilitate Bidirectional Travel. C. 3 Intermediate Decenttrails - 4200lf (Figure C) I. This Smooth Surface Trail Offers an Intermediate Flow/gravityfed Trail Experience With Rollers,berms, Jumps, Drops and Somewood or Stone Features. Ii. Typically, 4 Feet Wide, Thistrail Can Provide a Thrilling Experience for Beginner to Expert Levelriders. Iii the Trail Terminates at Thebottom of the Slope. Iv. All Tread Shall Be Constructed With a Minimum Tread of Four (4)feet Wide Using a Full Bench Excavation Whenever Possible. V. If Fill is Required, It Shall Bemechanically Compacted, and the Fill Slope Should Not Exceed 2:1slope. Vi. Fill Slopes Over 2:1 Require a Natural Stone Retaining Wall. Exceptions May Be Made at the Discretion of the Owner. Vii. Unavoidable Obstacles Shall Not Protrude More Than Eight (8)inches From the Tread Surface Andavoidable Obstacles Shall Not Bemore Than Twenty-four (24) Incheshigh, and Not More Than 50% Ofthe Tread Width, Unless Approved Differently by Owner. Please Include a Detailed Costof Estimate Including Flagging, Design, and Visualization as Well as all in Construction Costs. Estimates Should Include Final Quantities of Line-item Units as Well as Allowances for Armoring, Erosioncontrol, and Culverts (if Applicable). The Owner's Target Date Fortrails Being Substantially Complete Is 1 to 3 Years From the Projectcommencement. The Feasibility Ofcompleting the Work by That Dateshould Be Outlined in the Proposal.finally, the Proposal Should Include Key Dates Associated Withmilestones in the Proposal. Flagging Complete Design and Visualizationapproved Construction to Begin Construction Complete Bidders Are Advised Thatarkansas State Contractor Licensing Law Applies to This Project. subcontractors Are Also Required to Be Licensed According To arkansas State Law. Licensure is Not Required to Submit a Bid; However, Evidence of Licensure Shall be Provided to the Owner Prior Tosigning the Contract. Insurance Requirements. Successful Bidder Will Carry Insuranceas Listed Below. the Contractor Shall maintain Insurance of the Following Types: Workers Compensation $1,000,000

Award

Sidewalks / Parking Lot

$561,600.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
28
Bidding Soon
223
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2025

September 24, 2025

Project location map

Multiple Locations, Monticello, AR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.