EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 18, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Hightstown, New Jersey. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Work includes, but is not limited to 550 CY Test Pit, 2 UNIT Stump Removal, 10 UNIT Tree Removal, 10 UNIT Tree Plantings, 2 UNIT Type 'B' Inlet with Bicycle Safe Frame and Grate, 1 UNIT Type 'E' Inlet with Bicycle Safe Frame and Grate, 6 UNIT Type 'B' Bicycle Frame and Grate, 10 UNIT Eco Curb Piece, 9 UNIT Manhole Frame and Cover, 725 LF Storm Pipe, 1,185 LF Water Main, 4,300 LF Water Service, 24 UNIT Curb Valve and Box, 4 UNIT Fire Hydrant Assembly, 60 LF Permanent Trench Restoration, 3 UNIT Precast Sewer Manhole with Frame and Cover, 25 LF Sewer Main, 25 LF Concrete Encasement, 2,440 LF Concrete Curb, 825 SY Concrete Sidewalk, 605 SY Driveway Repair, 20 SY Detectable Warning Surface, 675 SY 12" Depth Excavation, 6,840 SY HMA Milling, 680 SY Pavement Repair, 733 GAL Tack Coat, 890 TON HMA Surface Course, 123 SY HMA Leveling Course, 115 TON Base Course, 70 CY Select Fill, 130 SY Compacted DGA, 50 CY Clean Stone, signage, pavement markings, and other incidentals. Please submit your bids on the standard bid proposal forms, in the manner designated and must be received in sealed opaque envelopes, bearing the name and address of the bidder and the name of the project on the outside; addressed to the Borough Clerk, Borough of Hightstown and must be accompanied by a Non-Collusion Affidavit and a bid bond or certified check for not less than ten percent (10%) of the amount of the bid, providing that said check or bid bond need not be more than $20,000.00 nor shall not be less than $500.00, and be delivered at the place and on or before the hour named above. Otherwise, no bids may be withdrawn for a period of sixty (60) days after the date and time set for the opening of the bids. The Borough reserves the right to reject any or all bids, or accept a bid which, in its judgment, best serves the interest of the Borough. N.J.A.C. 17:44- 2.2 requires Contractors to maintain all documents related to the contract for five years from the date of final payment and to make them available to the Comptroller's office upon request. Any awarded Contractor shall maintain all documentation related to products, transactions, or services under this contract for a period of five years from the date of final payment. Document Note: Contact Roberts Engineering Group, LLC by phone (609-586-1141) during regular business hours, 8:00 a.m. to 5:00 p.m., to provide account information and coordinate purchase and delivery of bid packages. Checks must be made payable to Roberts Engineering Group, LLC. In order to assure that all potential bidders receive the complete bid documentation, as well as any amendments, modifications or supplements thereto, bid documentation must be obtained only from the Borough Engineer Carmela Roberts, P.E., C.M.E., C.P.W.M. of Roberts Engineering Group, LLC, 1670 Whitehorse Hamilton Square Road, Hamilton, New Jersey 08690 by registering with the Borough Engineer and paying the required documentation fee. Question Deadline 03/21/2025 Any request for such interpretations shall be made in writing to the Engineer and will be given consideration ifit is received at least 10 days priorto the date scheduled for the opening of bids.

Post-Bid

Roads / Highways

$1,000,000.00

Public - City

Paving, Site Work

21

13

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Service Connections, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Control Equipment
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps, Manufacturing Equipment, Dies and Molds, Molds, Assembly and Testing Equipment, Cutting Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
546
Active Projects
335
Bidding Soon
5,009
All Active Projects
2,177
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2025

May 5, 2025

img_map_placeholder

Maxwell Ave, Hightstown, NJ

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Improvements to Maxwell Avenue

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.