BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 7, 2025 at 8:00 PM

Updated May 9, 2025

Site work and paving for a road / highway in Clayton, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of May 7, 2025, project was awarded to Colditz, awarded amount is $   $3,045,202.91 but unable to locate both in crm and google. PROJECT DESCRIPTION: A total of 16.195 miles of Deep Mill Patching, Leveling/Topping and new paving to be on fourteen separate County roads and four City Streets. Bridgecreek road: A total of 3.6 miles. To start at the intersection of Davis Gap Rd. and end at Covecrest Rd. Deep Mill Patching, Leveling/Topping. Patterson Gap road: A total of 2.2 miles. To start at the intersection of Persimmon Rd. and end at The Forest Service Rd. Deep Mill Patching, Leveling/Topping. Big Creek Road: A total of .3 miles. To start at the intersection of Betty's Creek Rd. and end at the North Carolina State Line. Leveling/Topping. Plum Orchard Rd: A total of 1.1 miles. To start at the intersection of Persimmon Road and end at the 1.1 mile mark, at the big bridge. Deep Mill Patching, Leveling/Topping. Cross Street: A total of .5 miles. To start at Down Home Lane and end at existing asphalt, just below Foxfire. New Paving, Binder and Topping. Pinnacle Road: A total of 2.4 miles. To start at Hwy 441 and end at Warwoman Rd. Deep Mill Patching, Leveling/Topping Hale Ridge Road: A total of .8 Miles. To start at Bald Mtn Rd. and end at the start of the Gravel Road. Leveling/Topping. Meeting House Mtn. Road: A total of .4 miles of new paving. To start at existing asphalt just before 911 #3142, and end just past 911 #2806. New paving, Binder and Topping Blalock Goldmine Road: A total of .6 miles of new paving. To Start at 911 #2755 and end at the .6 mile mark. New Paving, Binder and Topping. Stekoa Falls Road: A total of 1.1 miles. To start at Hwy 441 and end at Hwy 76 east. Leveling/Topping. Clois Road: A total of .525 Miles. To start at Stekoa Falls Rd. and end at the .525 mile mark. Leveling/Topping. Holcomb Lane: A total of .25 miles. To start at Stekoa Falls Rd. and end at Clois Rd. Leveling/Topping. Luther Watts Road: A total of .6 miles. To start at Stekoa Falls Rd. and end at the .6 mile mark, existing gravel Driveways. Leveling/Topping. Forester Street: A total of .27 miles. Starting a Marsengill Drive and ending at Dunlap Street. Deep Mill Patching, Leveling/Topping Valley Street: A total of .5 miles. To Start at Main Street and end at the intersection of North Valley street. Deep Mill Patching, Leveling/Topping Kelcy Mtn. Road: A total of .2 miles. To start at Bald Mtn Rd. and end at the dead end of the road. Leveling/Topping. Marsengill Drive: A total of .65 miles. To start at Shady Side Drive and end at Number 10 lane. Deep Mill Patching, Leveling/Topping Hiawassee Street: A total of .2 miles. To start at Main Street and end at Hwy 76 West. Deep Mill Patching, Leveling/Topping In addition, the Board of Commissioners of Rabun County reserves the right to show preference to local bidders inthe purchase of supplies, equipment and services. The amount shall not exceed five (5%) of the amount bid or quoted and I or fifty thousand dollars ($50,000), whichever is less. A bid bond inan equal to five percent (5%) of the total bid will be required. Also, performance and payment bonds each in a sum equal to the full amount of the contract will be required. The county reserves the right to reject any and all bids, to wave minor informalities, modify or re advertise the project.

Award

Roads / Highways

$3,395,384.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
259
Active Projects
152
Bidding Soon
1,859
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

June 2, 2025

Project location map

Multiple Locations, Clayton, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.