Published March 28, 2026 at 8:00 PM
Updated March 29, 2026
Site work and paving for a road / highway in Clayton, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of March 27 , 2026, the project was awarded to Pittman Construction, with an awarded amount of $4,525,352.62.** A total of 23.61 miles of Deep Mill Patching, Leveling/Topping, and new paving to be conducted on twenty-four separate County roads and seven City Streets. Eastman Mtn. road: A total of 2.3 miles. To start at the intersection of Boggs Mtn. Road. and end at Wolfcreek Road. Leveling/Topping. Screamer Mtn. drive: A total of 1.45 miles. To start at the intersection of Warwoman Road. and end at The Private entrance. Leveling/Topping. Curt Dotson road: A total of .35 miles. To start at the intersection of Screamer Mtn. drive. and end at the .35 mile mark. Leveling/Topping. Saddle Gap: A total of 1.35 miles. To start at the intersection of Warwoman Road and end at Screamer Mtn. drive. Leveling/Topping. Crusher Run Road: A total of 1.4 miles. To start at Kelly's Creek Road and end at the1.4 mile mark. Levelling/Topping. Ponderosa Road: A total of 1.1 miles. To start at Kelly's Creek Road and end at Crusher Run Road. Leveling/Topping. Wayfarer Road: A total of .3 miles of new paving. To start at Hwy 246 and end at the dead end Of the road. New Paving; binder and topping. Height's lane: A total of .42 Miles. To start at Pinnacle Rd. and end at the .42 mile mark. Leveling/Topping. Blanche Place Road: A total of .15 miles. To start at Pinnacle Road and end at the .15 mile mark. Levelling/Topping. Timberlane Road: A total of .7 miles. To Start at Hwy 28 and end at the .7 mile mark. Levelling/Topping. Crowe Creek Road: A total of 2.1 miles. To start at Low Gap Road and end at the start of the Gravel road. Levelling/Topping Ramey Road: A total of 1.15 Miles. To start at old Hwy 441 and end at The columns at Lakemont Highlands. Leveling/Topping. Scott's Creek Road: A total of .2 miles. To start at the .2 mile mark and end at Old Mill Road. Leveling/Topping. Old Mill Road: A total of .2 miles. To start at Scott's Creek Road. and end at Hwy 76. Leveling/Topping. Rainwater Trail: A total of 1.15 miles. To start at Murray's Cove Road and end at the dead-end sign. Leveling/Topping OV Jstus Road: A total of .55 miles. To Start at Betty's Creek Road and end at the start of the gravel Road. Leveling/Topping Talullah river Road: A total of .86 miles. To start at Persimmon Road and end at the .86 mile mark. Leveling/Topping FT Black Circle: A total of .4 miles. To start at State Line Road and end at State Line Road. Leveling/Topping Wolffork Church Road: A total of 1.0 miles. To start at North Wolffork Road and end at South Wolffork Road. Levelling/Topping. Taylors Chappel Road: A total of 1.05 miles; .9 resurface and .15 new paving. To start at Wolffork Road and end just past the lake parking access. Resurface consisting of levelling and topping. New paving consisting of Binder and topping. North Germany Mountan Road: A total of 1.05 miles, to start at Blackrock Mtn. Parkway and end At the gravel road. Consisting of deep mill patching, Levelling and topping. John Beck Dockins Road: A total of .875 miles, to start at Hwy 441 and end at the .875 mile mark. Consisting of Deep mill patching, Levelling and Topping. Boggs Mountain Road: A total of 1.0 miles, to start at the intersection of Eastman Mtn Road and End at the intersection of Rickman Airfield Road, Consisting of levelling and Topping. Leaning Chimney Drive: A total of .55 miles, to start at Old 441 and end at old 441, consisting of Levelling and topping. Chechero Street: A total of 385 feet, to start at the intersection of Savanah Street and end at Wall Street, consisting of milling out to a depth of three inches and going back with two inches of 19 mm and one inch of 9.5 mm. Toole Street: A total of .68 miles, to start at old 441 and end at the Toole Street intersection, Consisting of Levelling and Topping. Rickman Street: A total of .39 miles, to start at new asphalt joint by Rabun County Bank and end at Warwoman road, consisting of milling out to a depth of three inches and going back with two inches of 19 mm and one inch of 9.5 mm. Valley Street: A total of .25 miles, to start at the intersection of North Valley Street and end at Stornawy, consisting of deep mill patching, levelling and topping. Warwoman Road: A total of .4 miles, to start at Hwy 441 and end at .4 mile mark, consisting of Deep mill patching, levelling and topping. Clayburne Street: A total of .22 miles, to start at old 441 and end at the intersection of Smith Street, tying in all roads at the intersection, consisting of deep mill patching, levelling and topping.
Award
Roads / Highways
$4,525,353.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 16, 2026
May 15, 2026
Multiple Locations, Clayton, GA
Related To This Project
Clayton, GA
Bid Date: Feb 20 2026
Clayton, GA
Bid Date: Jan 23 2026
Clayton, GA
Bid Date: Nov 13 2025
Clayton, GA
Bid Date: May 22 2025
Clayton, GA
Bid Date: Apr 01 2025
Clayton, GA
Bid Date: Nov 18 2024
Clayton, GA
Bid Date: Oct 25 2024
Clayton, GA
Bid Date: Oct 25 2024
Clayton, GA
Bid Date: Dec 20 2024
Clayton, GA
Bid Date: Mar 11 2025
Clayton, GA
--
Clayton, GA
--
Clayton, GA
Bid Date: May 01 2024
Clayton, GA
Bid Date: May 14 2024
Clayton, GA
Bid Date: Apr 19 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.